Similar Projects
Installation of a Metal Roof on at the Water Treatment Plant Building
Renovation
Design
Blytheville, AR 72315

Z--Replace Peri VC Failing Roof System
Renovation - 11,500 SF
Sub-Bidding
$500,000 CJ est. value
Garfield, AR 72732

Roofs at Rural Rental
Renovation
Sub-Bidding
$200,000 CJ est. value
Trumann, AR 72472

Reroof Portions of the Flat Roof of Building 80 at the Arkansas Health Center
Alteration
Post-Bid
Benton, Little Rock, AR 72015

Reroof Portions of the Flat Roof of Building 80 at the Arkansas Health Center
Alteration
Post-Bid
Benton, Little Rock, AR 72015

Joe Martin Health Sciences Roof Replacement
Alteration
Results
Pocahontas, AR 72455

Roof Bid
Alteration
Results
Berryville, AR 72616

Roofing Bids: 4-5 Buildings
Renovation
Construction
$57,835 CJ est. value
Beebe, AR 72012

Pine Bluff Arsenal Building 10-030 Roof Repair by Replacement
Renovation
Sub-Bidding
$800,000 CJ est. value
White Hall, AR 71602

Reroof Jefferson Elementary
Alteration
Post-Bid
Little Rock, AR 72207

Arkansas Tech University McEver Hall Roof Replacement
Alteration
Results
$400,000 est. value
Russellville, AR 72801

Willow and Talkeetna Ice Rink Roof Repairs
Renovation
Sub-Bidding
$300,000 CJ est. value
Palmer, AR 72069

Roofing Project at Crater of Diamonds State Park
Alteration
Post-Bid
$300,000 est. value
Murfreesboro, AR 71958

Sealing of Metal Roof
Alteration
Results
$200,000 est. value
Hope, AR 71801

10-040 Roof Repair
Renovation
Sub-Bidding
$19,000,000 CJ est. value
White Hall, AR 71602

Last Updated 07/12/2023 07:31 AM
Project Title

Hector Roof Replacements

Physical Address View project details and contacts
City, State (County) Hector, AR 72843   (Pope County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: Hector Work Center (Hector, AR). The Contractor shall reference the Schedule of Items, Specifications and Drawings for a complete description of work items. Work includes, but is not limited to, the following major work items: Roof replacement - Work Center Building Roof replacement - Fleet Storage Building Roof replacement - Flammable Storage Building Roof replacement - Wildlife Shed Roof replacement - Pesticide Storage Building Roof replacement - Recreation Building (Option Item) Roof replacement - Gym The contractor shall provide all labor, tools, equipment, and materials to remove and replace any damaged materials including eaves, roof decking, fascia, flashing, aluminum drip edge and all shingles and underlayment. Work also includes replacing all boots/flashing on all roof vents. Project Name and Location: Hector Work Center Roof Replacements, located at the Hector Work Center, of Big Piney Ranger District in Ozark-St. Francis National Forest (Hector, AR). Tentative Dates: Issuance of the Request for Quote (RFQ) 06/13/2023 Site(s) Visit/Pre-Bid Conf (if needed) 06/23/2023 Date for Questions 06/30/2023 Bid Submittal Deadline 07/14/2023 Completion Date 60 Days after NTP Type of Contract: This is a Request for Quote which will result in award of a firm-fixed price contract. Award will be made to the lowest priced responsive/responsible bidder. Set Aside: The project is set-aside 100% for small businesses per FAR 19.5. The associated NAICS of this acquisition is 238160 Roofing contractors (size standard $19m). PSC Code Z2FB -REPAIR OR ALTERATION OF RECREATIONAL BUILDINGS. Magnitude: In accordance with FAR 36.204, the magnitude of this project is: Between $25,000 and $100,000. Solicitation and Documents: The solicitation and related documents will be available for download at http://beta.sam.gov on or about 06-13-2023. No hard copies of the solicitation will be mailed out. All RFI's regarding this solicitation shall be emailed to the Contract Specialist adam.doyle@usda.gov. Once received by the noted due date, the government shall respond within 5 business days. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Adam Doyle adam.doyle@usda.gov Nicholas Vozzo nicholas.vozzo@usda.gov The Scope of Work entails removal and replacement of any damaged materials including eaves, roof decking, fascia, flashing, aluminum drip edge and all shingles and underlayment on the seven roofs at the Hector Work Center. Work also includes replacing all boots/flashing on all roof vents.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents