Similar Projects
Police Athletic League Stadium Electrical Improvements - City of San Jose
Renovation, Infrastructure
Conception
$2,220,000 est. value
San Jose, CA 95116

Upcoming: Ballistic Windows
Alteration
Design
San Jose, CA

Upcoming - Sleeve Valve
Term Contract, Alteration
Design
San Jose, CA

Polymer
Term Contract
Sub-Bidding
Sunnyvale, CA 94089

Citywide as-Needed Repair Services
New Construction
Post-Bid
$10,000,000 CJ est. value
Santa Clara, CA

Site Maintenance Services
Alteration
Post-Bid
Less than $250,000 est. value
CA

General Building (B License) Construction, San Francisco, San Mateo, Santa Clara, and Alameda Counties
New Construction, Renovation
Results
$5,000,000 est. value

Digester Cleaning and Equipment Services
Alteration
Results
San Jose, CA

Handyman Service
Alteration
Post-Bid

SJCC Stadium Renovation
Renovation
Results
$5,500,000 est. value
San Jose, CA 95113

Parking Lot Steam Cleaning - Gilroy Cvef Northbound And Southbound
Term Contract
Post-Bid
San Martin, CA

HVAC and Refrigeration System Repairs
Alteration
Results
$200,000 est. value
CA

Rentals Portable Restrooms and Hand Washing Stations
Term Contract
Post-Bid
San Jose, CA

Whole Structure Fumigation
Term Contract
Results

Citywide Pest Control Services
Term Contract
Post-Bid
Santa Clara, CA 95050

Last Updated 08/01/2022 03:34 PM
Project Title

Levi's Stadium Signage Assessment

Physical Address View project details and contacts
City, State (County) Santa Clara, CA 95054   (Santa Clara County)
Category(s) Entertainment/Recreation, Single Trades
Sub-Category(s) Service/Term Contracts, Stadium
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Q & A deadline: Aug 05, 2022 8:30:00 PM EDT The Santa Clara Stadium Authority (Stadium Authority) is a public joint powers authority established to develop, own and be responsible for the operation of Levi's Stadium, a premiere outdoor sports and entertainment venue on the West Coast and home to the San Francisco 49ers National Football League (NFL) Team. The Stadium Authority is responsible for repairing and maintenance of certain Levi's Stadium signage, including four illuminated exterior signs that were installed in 2014. The Stadium Authority is requesting submittals from qualified firms to assess the condition of four Levi's Stadium signs and provide a recommendation and corresponding report based on the assessment.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents