Similar Projects
Shake Shack / Des Peres
New Construction, Infrastructure - 3,453 SF
Design
$1,000,000 CJ est. value
Des Peres, MO 63131

Logan University Fuhr Science Center
Addition, Demolition, Renovation, Infrastructure - 14,400 SF
Design
$28,000,000 CJ est. value
Chesterfield, MO 63017

8 Bridge Rehabilitation, Pavement Repair
Infrastructure
Bidding
$15,000,000 CJ est. value
Saint Louis, MO 63131

8 Bridge Rehabilitation, Pavement Repair
Infrastructure
Bidding
$15,000,000 CJ est. value
Saint Louis, MO 63131

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Rehabilitation of Abandoned Property
Renovation, Infrastructure
Post-Bid
Ferguson, MO

Spanish Pond ADA Improvements
New Construction
Results
MO 63138

Repave Streetscape at Justice Center
Results
Ballwin, MO 63011

The McKenzie
New Construction, Infrastructure
Construction
$107,500,000 CJ est. value
Saint Louis, MO 63124

The McKenzie
New Construction, Infrastructure
Construction
$107,500,000 CJ est. value
Saint Louis, MO 63124

West Adams Avenue Condominiums / Kirkwood
New Construction, Infrastructure - 8,817 SF
Pending Verification
$2,000,000 CJ est. value
Kirkwood, MO 63122

Real Dill Pickleball Club At The District
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Chesterfield, MO 63005

Woods Mill Center / Maryville University Esports Arena and Mixed Use
New Construction, Infrastructure - 6,000 SF
Design
$100,000,000 CJ est. value
Town and Country, MO 63017

Des Peres Road Roundabout
Infrastructure
Bidding
$2,082,910 CJ est. value
Des Peres, MO 63131

Property Redevelopment
Infrastructure
Post-Bid
Saint Louis, MO 63121

Last Updated 10/19/2022 07:07 PM
Project Title

Heintz Road Bridge No. 513 Replacement

Physical Address View project details and contacts
City, State (County) Oakville, MO 63129   (Saint Louis County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,456,000 [brand] Estimate
Plans Available from Copy Center - 10/03/22
Owner View project details and contacts
Architect View project details and contacts
Description

St. Louis County Project No. CR-1282, Federal Project No. STP-4900(639), consists of the removal of an existing bridge and construction of a new bridge along with grading, clearing and grubbing, removal of existing and construction of new asphalt roadway and other incidental items necessary to complete the above in a workmanlike manner on Heintz Road from Baumgartner Road to 360' North of Royal Point Drive within St. Louis County. The successful Bidder or Bidders shall be required to comply with the most current applicable Federal (DavisBacon Act) and State statutory provisions concerning the payment of prevailing wages on public works, Section 290.210 through 290.340 R.S. Mo. 1959, as amended. All contractors must be on the Missouri Department of Transportation's approved contractor listing, seven (7) days prior to bid opening. Contractors and sub-contractors who sign a contract to work on a public works project shall provide a ten (10) hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. St. Louis County hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. All questions must be submitted by 5:00 p.m. on October 26, 2022 via e-mail to the Contract Administrator, Shandrika Combs, SCombs@stlouiscountymo.gov. Bids must be accompanied by a certified check or bidder's bond in an amount equal to 5% of the total bid. All checks shall be made payable to "Treasurer, St. Louis County." The right is reserved by the St. Louis County to reject any or all bids. The DBE Goal for this project is 13% No 2nd tier subcontracting will be allowed on this project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents