Similar Projects
Asbestos Abatement 1500 North Memorial
Alteration
Bidding
Racine, WI 53404

Phase II Floors 1-2 Asbestos Abatement
Alteration
Bidding
$515,000 est. value
Milwaukee, WI 53212

Timber Sales
Term Contract
Post-Bid
Hayward, WI

Pre-Demolition Asbestos Abatement City Owned Structures
Post-Bid
Mequon, WI 53092

Chippewa County First Floor Remodeling Asbestos Abatement
Results
Chippewa Falls, WI 54729

Statewide Asbestos Abatement Services
Term Contract
Results
Less than $150,000 est. value

Mold Abatement and Site Restoration Services
Term Contract
Post-Bid
Madison, WI

Public Lead Service Replacements
Results
$850,000 est. value
Janesville, WI

Sludge Removal And Disposal
Term Contract
Post-Bid

Le Phillips Memorial Library - Hazardous Material Abatement
Results
Eau Claire, WI 54701

West HS Abatement/Demolition
Post-Bid
Madison, WI 53726

Glenwood City Former Elementary School Demolition
Demolition
Results
Glenwood City, WI 54013

Courthouse Complex T & M
Term Contract
Post-Bid
Milwaukee, WI 53233

Invasive Plant Control 2021
Post-Bid
WI

2021 Time & Material Parks Facilities
Term Contract
Post-Bid
Milwaukee, WI

Last Updated 06/24/2021 01:22 PM
Project Title

Student Union Asbestos Abatement

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53211   (Milwaukee County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $28,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of the renovation of the existing UW Milwaukee Student Union that anticipates moderate site upgrades, exterior envelope restoration and cleaning, selective roof replacement, exterior building canopies at the Kenwood, West and Spaights Plaza entries, selective interior upgrades to the street level, campus level, second and third floors, as well as major building system upgrades and additions to the existing mechanical, electrical, and fire alarm systems including the expansion of the existing penthouse as well as a new penthouse. The building does not currently have fire protection and this project will also integrate new fire protection into the building in areas of level two or greater alteration. As a result of the penthouse upgrades and additions, as well as the newly added canopies, there is structural reinforcement anticipated to the existing system; foundations and columns. The interior upgrades are anticipated to include finish and fit out, as well as lighting, audio visual and technology upgrades.

Details

Division 02 - Existing Conditions, Hazardous Material Assessment, Asbestos Assessment, Asbestos Remediation, Asbestos Abatement.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents