Similar Projects
Sioux City Elec Maint Bld Water Softener Replacement
Alteration
Post-Bid
Hinton, IA 51024

Polk County Election Office Fire Suppression, Plumbing, Mechanical and Electrical Repairs
Alteration
Results
Des Moines, IA 50309

Plumbing for Two (2) Calcium Chloride Tanks
Infrastructure, Alteration
Results
Davenport, IA 52807

2023 Intake Repair Program
Infrastructure, Renovation
Bidding
$400,000 CJ est. value
Bettendorf, IA 52722

Cobblestone Hotel & Suites - City of Ottumwa
New Construction, Infrastructure - 46,332 SF
Post-Bid
$9,900,000 CJ est. value
Ottumwa, IA 52501

Wastewater Reclamation Facility Belt Filter Press Improvements
Renovation
Bidding
$2,100,000 CJ est. value
Des Moines, IA 50317

West 3rd Street and West Street Intersection Improvements
Infrastructure
Results
$940,270 CJ est. value
Sioux City, IA 51103

Install Multiplex Water Softener
Alteration
Post-Bid
$250,000 to $500,000 est. value
Ames, IA 50010

Wastewater Reclamation Authority (WRA) Ingersoll Run Outlet Sewer, Phase 28, Segment 1 Rebid
Infrastructure
Bidding
$15,010,000 CJ est. value
Des Moines, IA 50309

Lake Wapello State Park Boy Scout Pond Outlet Replacement
Renovation, Infrastructure
Results
Drakesville, IA 52552

Last Updated 09/24/2022 01:31 PM
Project Title

HTT Water Transmission Main & Drainage Improvements

Physical Address View project details and contacts
City, State (County) Ankeny, IA 50023   (Polk County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $4,654,285 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes two divisions of work. Division I improvements include the installation of a 24-inch diameter water transmission main from the Ash Water Tower along the HTT Trail and NW 18th Street to the intersection of NW Irvinedale Drive and NW 18th Street. This work includes approximately 9,900 LF of 24-inch diameter transmission main constructed by trenched and trenchless methods, including related work such as water main connections, valves, hydrants, erosion control, surface restoration, and miscellaneous associated work. Division II work includes drainage channel improvements along NW 18th Street and the HTT Trail from NW Greenwood Street to NW 4th Street. This work includes approximately 2,600 feet of channel grading improvements, selected clearing and grubbing, debris and obstruction removal, channel and outlet stabilization, minor storm sewer and intakes, and associated work. Completion of Work: The Contractor shall fully complete Division I of the project within one hundred seventy (170) working days. The Contractor shall fully complete Division II of the project within ninety (90) working days.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents