Similar Projects
Village of Troy
New Construction
Conception
Troy, MI 48085

Novi Medical Building
New Construction, Infrastructure - 2,558 SF
Design
$1,486,198 CJ est. value
Novi, MI 48377

Bebb Oak Meadows Mixed-Use
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Rochester Hills, MI 48307

CDBG ADA Sidewalk and Ramp Installation Project
Infrastructure
Post-Bid
$800,000 CJ est. value
Milford, MI 48381

CDBG ADA Sidewalk and Ramp Installation Project
Infrastructure
Post-Bid
$800,000 CJ est. value
Milford, MI 48381

City Hall Campus Parking Lot Replacement Project
Results
Less than $298,362 est. value
Farmington Hills, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Hechtman Senior Apartments: Renovation and Addition
Renovation, Addition - 3,978 SF
Construction
West Bloomfield, MI 48322

The Alcove
New Construction, Renovation
Construction
$2,500,000 est. value
Southfield, MI 48076

Pella-Dar Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Royal Oak, MI 48067

Pella-Dar Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Royal Oak, MI 48067

Camden Crossing Condos
New Construction, Infrastructure
Design
$9,500,000 CJ est. value
Rochester Hills, MI 48309

Mercer Beach Improvements Phase 1
Infrastructure
Post-Bid
Walled Lake, MI

19.56 MI of Hot Mix Asphalt Cold Milling and Resurfacing, Full Depth Concrete Pavement Repairs, Joint Repairs and Pavement Markings
Results

Westwood Apartments - Phase 2
New Construction
Construction
Pontiac, MI 48341

Last Updated 03/09/2023 09:09 AM
Project Title

Clover Communities: Senior Living Apartments - Auburn Hills

Physical Address View project details and contacts
City, State (County) Auburn Hills, MI 48326   (Oakland County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Parking Garage, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $8,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 9, 2023 construction is underway. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Apartments/Condominiums, 4 Stories Above Grade, 135,572 SF New Construction, 119 Unit(s), 7.57 Acres, New Construction, 133 Parking Spaces.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents