Similar Projects
San Souci Road Elevation Design
Infrastructure
Design
WA

UST Inspect Maintain and Repair
Alteration
Design
$1,000,000 est. value
WA

2021 Downtown Overlay and Utility Project COB Project
Infrastructure
Bidding
$1,800,000 to $2,000,000 est. value
Bothell, WA

I-405/SR 92, SR 520 Vic I-5 Vic and SR 9 Vic Paving and Ada Compliance
Infrastructure
Bidding
$7,500,000 to $10,000,000 est. value

Curb Management Plan
Infrastructure
Post-Bid
$150,000 to $225,000 est. value
Bellevue, WA 98007

I-90, SR18 I/C to Deep Creek - Interchange Improvements and Widening Project
Infrastructure
Post-Bid
WA

Construction of the 34th Avenue S, South 166th Street to South 160th Street
Infrastructure
Results
$6,250,000 to $7,250,000 est. value
Sea-Tac, SeaTac, WA 98188

2021 Sidewalk And ADA Improvements
Infrastructure
Results
$200,000 to $300,000 est. value
Auburn, WA 98092

CRT5 Repair Construction
Alteration
Design
$1,000,000 est. value
WA

Engineering Services
Alteration
Bidding
Issaquah, WA

Transit Facility Improvements Work Order
Infrastructure
Post-Bid
WA

SR 516 - Jenkins Creek to 185th Pl SE
Infrastructure
Results
Covington, WA 98042

I-90/I-5, E Sunset Way Vic and Nb Lowell Rd Vic Pccp Exp Jnt Rehab and Deck Overlay
Infrastructure
Bidding
Less than $1,250,000 est. value

Task Order Unit Price - Curb Ramps and Sidewalks Contract 2
Term Contract, Infrastructure
Post-Bid
Less than $4,000,000 est. value
Seattle, WA

124th Avenue NE- NE 12th Street to NE Spring Boulevard
Infrastructure
Results
$8,221,853 est. value
Bellevue, WA 98007

Last Updated 01/18/2022 04:45 PM
Project Title

4th Street Southeast Preservation - Auburn Way South to L Street Southeast

Physical Address View project details and contacts
City, State (County) Auburn, WA 98002   (King County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,300,000 to $4,700,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The major items of work include reconstruction of 4th Street SE from Auburn Way South to L St SE including site preparation and demolition, constructing new pavement surfacing, sidewalks, curb and gutter, curb walls, storm water conveyance, water main, sanitary sewer main, franchise utility coordination, private property restoration, landscaping restoration, permanent signing, and traffic control and staging, and other work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents