Similar Projects
Last Updated | 06/15/2021 03:10 AM |
Project Title | Hitchcock Park Green Infrastructure 2021 |
Physical Address | View project details and contacts |
City, State (County) | Omaha, NE (Douglas County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work consists of overall maintenance for the Hitchcock Park Green Infrastructure Facility. Stormwater runoff from the neighborhood east of Hitchcock Park will drain to one of three outlets that drain into one of the three bioretention system in the park. The bioretention systems run in series to the south where they are connected to existing storm sewers at the south end of the park (constructed as part of OPW 50079). Overflow from the bioretention systems will drain to an area inlet (Outlet Structure - ID 0643507B) at the south end of the park, which ultimately drains to Blood Creek |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |