Similar Projects
Central Park Pavilion and Site Improvements
New Construction
Post-Bid
La Vista, NE 68128

Adams Park Green Infrastructure 2021
Infrastructure
Results
Omaha, NE

Last Updated 06/15/2021 03:10 AM
Project Title

Hitchcock Park Green Infrastructure 2021

Physical Address View project details and contacts
City, State (County) Omaha, NE   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of overall maintenance for the Hitchcock Park Green Infrastructure Facility. Stormwater runoff from the neighborhood east of Hitchcock Park will drain to one of three outlets that drain into one of the three bioretention system in the park. The bioretention systems run in series to the south where they are connected to existing storm sewers at the south end of the park (constructed as part of OPW 50079). Overflow from the bioretention systems will drain to an area inlet (Outlet Structure - ID 0643507B) at the south end of the park, which ultimately drains to Blood Creek

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents