Similar Projects
Pike Road Housing Development
New Construction, Infrastructure
Conception
$400,000,000 CJ est. value
Pike Road, AL 36064

Pike Road Housing Development
New Construction, Infrastructure
Conception
$400,000,000 CJ est. value
Pike Road, AL 36064

Residence Inn By Marriott / Montgomery
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Montgomery, AL 36117

Home 2 Suites / Montgomery
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Montgomery, AL 36117

Gymnasium Addition and Driveway Improvements
New Construction, Infrastructure
Bidding
$700,000 CJ est. value
Montgomery, AL 36117

Gymnasium Addition and Driveway Improvements
New Construction, Infrastructure
Bidding
$700,000 CJ est. value
Montgomery, AL 36117

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RSA Annex Project Phase 1 Sitework
Infrastructure
Post-Bid
Montgomery, AL

Constructing the Roadway Improvements (High Friction Surface Treatment) on the i-85 Southbound Ramp to i-65 (Southbound) in Montgomery
Infrastructure
Results
$420,888 to $514,419 est. value
Montgomery, AL

Constructing the Bridge Widening on I-85 (Northbound and Southbound Roadways) Over Line Creek and Relief Bridges
New Construction, Term Contract
Results
$16,235,261 to $19,843,097 est. value

New Recreation Center - City of Montgomery
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Montgomery, AL 36104

Motley Drive Townhouse
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Montgomery, AL 36110

Beverage Park - Manna Capital Partners Manufacturing Facility
New Construction, Infrastructure - 1,700,000 SF
Conception
$600,000,000 CJ est. value
Montgomery, AL 36104

Emory Folmar YMCA Soccer Complex
New Construction, Infrastructure
Bidding
$450,000 CJ est. value
Montgomery, AL 36117

Various County Road Resurface Project
Infrastructure
Post-Bid
Hope Hull, Montgomery, Ramer, AL 36124

Last Updated 04/24/2023 09:35 AM
Project Title

Planing, Resurfacing, Safety Improvements (Bridge Rail Retrofit and Guardrail Installation), and Traffic Stripe on SR-152

Physical Address View project details and contacts
City, State (County) Montgomery, AL 36110   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $4,730,720 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

County : Montgomery Constructing the Planing, Resurfacing, Safety Improvements (Bridge Rail Retrofit and Guardrail Installation), and Traffic Stripe on SR-152 from the I-65 Interchange to the SR-9 (US-231) Interchange. Length 6.402 mi. The Bracket Estimate on this project is from $4,218,249 to $5,155,638 . Contract Time: 110 Working Days If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 027 - Planing, Resurfacing, Safety Improvements (Bridge Rail Retrofit and Guardrail Installation), and Traffic Stripe on SR-152 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents