Similar Projects
Aeration System for Culver Lake
Renovation, Demolition
Design
Branchville, NJ 07826

Atrium and Hooton Pump Station Upgrades
Renovation
Bidding
$1,200,000 est. value
Willingboro, NJ

Jackson Mills Road Water Treatment Plant South Side Filter Upgrades
New Construction
Bidding
Asbury Park, NJ

Diamond Drive Pump Station Rehabilitation
Post-Bid
Waretown, NJ 08758

2020 Proposal Influent Grinders for Wastewater Stations
Term Contract
Post-Bid
Somers Point, NJ 08244

Replacement of Reverse Osmosis (RO) Membrane Elements
Results
Keansburg, NJ

WWTP Tertiary Filter Replacement
Results
$397,000 est. value
Flanders, NJ 07836

2019 Reconstruction of Facilities at the Ship Bottom Water Treatment Plant
Construction
Ship Bottom, NJ 08008

Water Treatment Plant Upgrade, Chemical Building Expansion - Phase 2
Construction
Florence, NJ 08518

Old Orchard Pump Station Relocation
Renovation
Bidding
Eatontown, NJ

2020 Proposal Sewer Pump Station Maintenance
Term Contract
Post-Bid
Somers Point, NJ 08244

Influent Screening Facility
Results
Budd Lake, NJ 07828

Carl J. Olsen Treatment Plant - Upgrades and New Ozone Treatment Facility
New Construction, Renovation
Construction
Edison, NJ 08817

Grandview Pump Station Improvements
Post-Bid
Thorofare, NJ 08086

Maintenance and Repair of Sewer Lift Stations
Term Contract
Results
$175,000 est. value
New Brunswick, NJ 08901

Last Updated 09/23/2021 10:07 AM
Project Title

Valley Road Corrosion Control Chemical Feed System Phase II

Physical Address View project details and contacts
City, State (County) Montclair, NJ 07043   (Essex County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work involves furnishing and installing two (2) underground vaults and two (2) fiberglass reinforced plastic (FRP) tanks to store zinc orthophosphate, furnishing and installing a pump station to keep the area around the vaults dry, furnishing and installing new fill stations, new transfer pumps and a day tank, paving and restoration, testing of the new system and removal of the existing temporary above ground HDPE storage tanks and containment area.

Details

Water Treatment Plant, Renovation, Lift and Pump Stations, Renovation.
Division 22 - Plumbing.
Division 26 - Electrical.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents