Similar Projects
Lincoln Ave Rehabilitation - California To Silverado - City Of Napa
Alteration
Conception
$2,500,000 est. value
Napa, CA 94559

Hennessey Treatment Plant Paving Improvements - WQ23UT07 - City of Napa
Infrastructure
Conception
$250,000 est. value
Napa, CA 94558

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Hess Collection Expansion
New Construction, Infrastructure - 217,000 SF
Design
$22,000,000 CJ est. value
American Canyon, CA 94503

Replace and Place Cement Liner on RCB Culvert
Infrastructure
Bidding
$2,130,000 CJ est. value
American Canyon, CA 94503

Rector Diversion Valve Replacement
Infrastructure
Bidding
$899,600 CJ est. value
Napa, CA 94558

Parking Lot Sweeping and Pressure Washing and or Steam Cleaning Service
Term Contract
Post-Bid
$50,000 est. value
Napa, CA 94558

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Cold Plane AC, Place HMA (TYPE A) and RHMA-G
Infrastructure
Results
$8,600,000 est. value
CA

HMA, Roadway Excavation, Structural Conc and Modifying Lighting Systems
Infrastructure
Results
$42,000,000 est. value
CA

Napa Cove Affordable Apartments
New Construction, Infrastructure
Construction
$36,445,998 CJ est. value
American Canyon, CA 94503

American Canyon Road East Rehabilitation - TR22-0100 - City of American Canyon
Infrastructure
Construction
$200,000 CJ est. value
American Canyon, CA 94503

Castlevale Winery
New Construction, Infrastructure - 21,795 SF
Pending Verification
$2,300,000 CJ est. value
Saint Helena, CA 94574

Element 7 / American Canyon
New Construction, Infrastructure - 7,000 SF
Pending Verification
$2,000,000 CJ est. value
American Canyon, CA 94503

Park Ave and El Centro Highway Crossings Construction - WD25UT03 - City of Napa
Infrastructure
Conception
$1,000,000 est. value
Napa, CA

Last Updated 02/06/2023 11:04 PM
Project Title

RFQ D/B - Smittle Creek Trail Bridges Project

Physical Address View project details and contacts
City, State (County) Napa, CA 94558   (Napa County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $928,162 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Award Details Contract Award Date: Feb 02, 2023 Contract Award Number: 6982AF23C000014 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: FCJCDUZV7RM3 Contractor Awarded Name: North Star Government Services Contractor Awarded Address: San Diego, CA 92101-8705 USA Base and All Options Value (Total Contract Value): $928162.00 CA ERFO 2020-1(1) Smittle Creek Trail Bridges Project Bureau of Reclamation, Central California Area Office, Lake Berryessa Design-Build Request For Qualifications Solicitation Number 6982AF22R000005 The Central Federal Lands Highway Division (CFLHD) of the Federal Highway Administration (FHWA) is conducting a "two phased" Design-Build (D-B) selection process for the Smittle Creek Trail Bridges Project. Under this Notice, CFLHD is soliciting D-B firms/teams (Proposer) to participate in Phase One - Request for Qualifications (RFQ) - of the selection process. This is NOT a Request for Proposal. A solicitation package is not available. A non-mandatory pre-proposal Microsoft Teams meeting will be held on August 16, 2021, at 10:00 a.m., Local Mountain Time. A request must be sent to CFLcontracts@dot.gov for registration. A Microsoft Teams calendar invitation will be sent NLT August 15, 2022, 10:00 a.m., Local Mountain Time. There will be no summary of the Microsoft Teams meeting for those who do not participate. All questions must be consolidated and submitted on a word document and emailed to CFLcontracts@dot.gov with 6982AF22R000005 - CA ERFO 2020-1(1) Smittle Creek Trail Bridges - SOQ RFI in the subject line. Questions must be submitted by August 24, 2022, 2:00 p.m. Local Mountain Time. This Request for Qualifications is being issued concurrently with the development and review of the replacement bridge layouts that will determine the final Scope of Work and other project requirements. Any work described herein is subject to adjustment as a result of the bridge layout process and other decisions of the Government. The North American Industry Classification System (NAICS) code for this acquisition is 237310 Highway, Street, and Bridge Construction; the small business size standard is $39.5 million. Statements of Qualifications (SOQ) will only be accepted from Proposers intending to provide complete services required under the Contract. Responses from individual engineering, construction, or consultant firms not offering to provide all required services will be deemed non-responsive and will not be accepted. SUBMIT ONE (1) COPY OF YOUR RESPONSE BY 2:00 PM Local Mountain Time, September 8, 2022, to the following email address: cflcontracts@dot.gov (fax and mailed copies will not be accepted) Include the following in the subject line: Solicitation Number 6982AF22R000005 - CA ERFO 2020- 1(1) Smittle Creek Trail Bridges - SOQ. Submit questions to: CFLContracts@dot.gov11 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents