Similar Projects
Right of Way Tree Trimming
Term Contract
Design
Newport, TN 37821

Wastewater Project - Odell Road Low Pressure Sewer
Infrastructure
Design
$300,000 CJ est. value
Newport, TN 37821

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Cherokee National Forest Road Maintenance Idiq
Term Contract
Post-Bid
Tellico Plains, TN 37385

Newport Grammar School Playground
Renovation, Infrastructure
Design
$500,000 CJ est. value
Newport, TN 37821

The resurfacing using high performance fog seal on S.R. 107
Infrastructure
Post-Bid
$496,550 CJ est. value
Del Rio, TN 37727

First Baptist Church Condo Conversion
Demolition, Build-out, Infrastructure
Design
$1,000,000 CJ est. value
Newport, TN 37821

Right of Way Tree Trimming and Vegetation Management
Term Contract
Post-Bid
Newport, TN 37821

Cocke County Memorial Building Conversion Phase 1
Renovation, Infrastructure
Design
$750,000 CJ est. value
Newport, TN 37821

Rehab of Two (2) Homes and the Demolition / Construction of One (1) New Homes
Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$400,000 CJ est. value
Newport, TN 37821

Firehouse Subs / Newport
Demolition, New Construction, Infrastructure - 2,000 SF
Design
$500,000 CJ est. value
Newport, TN 37821

Water Line Extension for Jones Cove Road Area
Infrastructure
Post-Bid
$560,000 CJ est. value
Cosby, TN 37722

Construction of the Wastewater Treatment Plant - Plant Drainage Lift Station Replacement - 2022
Demolition, New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Newport, TN 37821

Basin - J Sewer Outfall Rehabilitation
Infrastructure
Post-Bid
$550,000 CJ est. value
Newport, TN 37821

Last Updated 05/11/2023 11:06 AM
Project Title

Newport Utilities Old Cave Church Road Sewer Pump Station

Physical Address View project details and contacts
City, State (County) Newport, TN 37821   (Cocke County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Newport Utilities Old Cave Church Road Sewer Pump Station Questions Due - November 8, 2022 Pump Station work to commence December 1, 2022

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents