Similar Projects
Penn Hills 2019 CCTV Inspection Contracts - Contract B
Post-Bid
Pittsburgh, PA 15123

Lower Yoder Sanitary/Storm Sewer Separation Project Phase III
Post-Bid
Johnstown, PA 15901

Sanitary Sewer Lining
Results
$175,000 est. value
Sharon Hill, PA 19079

Sanitary Sewer Cleaning
Results
Johnstown, PA 15905

Big Heart Pet Brands Wastewater Improvements
Renovation
Construction
Bloomsburg, PA

Water Valve Replacements Phase 4
Post-Bid
Tarentum, PA 15084

Sanitary Sewer Improvement Project
Results
Masontown, PA

Construct a Small Flows Treatment Facility on their Parcel of Land Located Near the Intersection of Meadowood Road and Emery Church Road
Post-Bid
State College, PA

Water Street Waterline Replacement Project
Results
Linesville, PA

Saint Michael Pennsylvania South of Salix Sewer Extension Project - General
Post-Bid
Forest Hills, PA 15221

Woodland Avenue CCTV Project
Results
Waynesburg, PA

Ductile Iron Pipe
Term Contract
Post-Bid
Erie, PA 16507

Sr 208 Additional Force Main
Results
Mercer, PA

2020-2021 Maintenance of Sanitary Sewer Collection System
Term Contract
Post-Bid
Aliquippa, PA 15001

Backwater Valve Maintenance Contract
Results
Pittsburgh, PA

Last Updated 01/22/2020 02:41 PM
Project Title

Sanitary and Storm Water Cipp Project

Physical Address View project details and contacts
City, State (County) Lock Haven, PA 17745   (Clinton County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Contract generally consists of the Cured In Place Pipe (CIPP) trenchless rehabilitation of approximately 1,760 feet of 24-inch vitrified clay pipe, CIPP trenchless rehabilitation of approximately 1,530 feet of 15-inch Corrugated Metal Pipe (CMP), rehabilitation of 7 manholes by spray on Polymer Coating, the reinstatement of 2 sanitary sewer laterals, the installation of flow channels within the manholes and the surface restoration of the work site as needed. The location of the proposed construction is along East Walnut Street (City right of way) from Grove Street to Washington Street, along Woods Avenue (Flemington Borough ROW) from Huston Street to Shady Lane and Frederick Street (Flemington Borough ROW) at the intersection with Huston Street Restoration work will include any disturbance in the existing surfaces due to the rehabilitation of the sewer lines. The project will also include the maintenance and protection of traffic along all roadways.

Details

Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving Joint Sealants, Paving Specialties.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents