Similar Projects
DSS Building - Chiller Replacement Phase 2
Post-Bid
Fayetteville, NC 28301

College Lakes Elementary Kitchen A/C
Post-Bid
Fayetteville, NC 28311

Hope Mills and South View Middle School Gymnasium HVAC Renovation Project
Results
Hope Mills, NC 28348

HVAC Maintenance Contract
Term Contract
Results
Less than $713,590 est. value
Dunn, Erwin, Lillington, Spring Lake, NC 27546

Hope Mills Middle Auditorium Compressor Replacement
Post-Bid
Hope Mills, NC 28348

Pine Forest Middle School Gym HVAC Addition
Results
Less than $168,000 est. value
Fayetteville, NC 28311

Crown Coliseum Cooling Tower Replacement
Post-Bid
Fayetteville, NC 28302

Westover High School HVAC Infrastructure Phase II
Results
Fayetteville, NC 28303

Spring Lake Chiller Replacement
Post-Bid
Fayetteville, NC 28302

Job Order Contract for HVAC Installation and Repair
Term Contract
Results
Fayetteville, NC 28302

Removal of Thirty-Two (32) R-22 10 Seer Air Handlers in 32 Occupied Apartment Units
Post-Bid
Fayetteville, NC 28301

Hope Mills Middle Locker Room HVAC Addition
Results
Less than $17,333 est. value
Hope Mills, NC 28348

SPLFRC Packaged Unit Replacement
Post-Bid
Spring Lake, NC 28390

Pine Forest Middle School Building 3 HVAC Renovation
Results
Fayetteville, NC 28311

Welding-Lawn Equipment Repair Shop A/C Replacement
Post-Bid
Fayetteville, NC 28306

Last Updated 01/18/2021 01:14 PM
Project Title

71st High Room 922 A/C replacement

Physical Address View project details and contacts
City, State (County) Fayetteville, NC 28304   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To remove and dispose of existing air handler and condensing unit. Contractor is to install a new 7.5 ton 2 stage heat pump with new line sets. The new unit will match existing unit voltage, and phase. The heat strips will be a minimum of 15 kw. The contractor will install a new programmable 2 stage cooling and three stage heating thermostat. The contractor will connect the new unit to existing duct. All duct joints and connections will be sealed with mastic. The contractor will install a new disconnect, power wiring, and conduit from disconnect to unit. The contractor is responsible for all permits and inspections.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents