Last Updated | 07/26/2022 10:07 AM |
Project Title | Hurricane Sally Repairs at Brent Fire Station |
Physical Address | View project details and contacts |
City, State (County) | Pensacola, FL 32505 (Escambia County) |
Category(s) | Government/Public, Single Trades |
Sub-Category(s) | Fire Protection, Fire/Police Station |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This contract is to remove and replace the herein specified damaged components located at the Brent Fire Station, 5925 North W Street, Pensacola, Florida 32505. The Brent Fire Station building site encompasses an approximate 10,200 SF footprint. It is a one (1) story structure visible from North W Street. The external building facade was observed to be brick masonry. The building is surrounded by asphalt on two sides in the form of either parking lots or drives. There are four (4) large commercial roll-up doors on both the western and eastern sides of the building - presumably for emergency vehicle ingress and egress. Four (4) aluminum framed doors were noted along the exterior of the building; one at the front of the fire station for general public access, one at the rear of the building for personnel access to the living quarters, and two at the side of the building for personnel access to the vehicle bays. The roof is a hipped corrugated R-panel metal roof over a lumber deck with varying pitches due to the design of the roof. The interior is broken up into two (2) separate sections - vehicle cargo bay and living areas. The personnel areas (kitchen, living quarters, and common rooms) have typical interior finishes such as painted gypsum wallboard, suspended ceiling grid systems with batt insulation, vinyl tile floors and rubber wall base molding. Coordinates: 30 28' 26.09" N, 87 15' 22.50" W General 1. It is the responsibility of the Contractor to fully investigate the existing conditions and scope recommendations associated with this project prior to submitting a bid. 2. All construction and construction actions shall comply with local, state, and federal safety codes/requirements. 3. Contractor shall supply, receive, off-load, and maintain all materials and equipment needed to support and achieve the work described above. 4. All equipment necessary to perform the work shall be provided by the Contractor. The use of Escambia County's equipment and personnel shall not be permitted. 5. The Contractor shall protect the building components and surrounding property from any damage directly or indirectly related to the construction activities and provide all construction barriers required by this work to protect the Contractors and Escambia County's property and personnel. 6. The Contractors bid shall include, but not be limited to, mobilization, safety, overhead equipment, materials installation equipment, personnel, and profit fees to perform the work described. 7. The contractor shall verify all existing conditions referred to in the document and take steps necessary for compliance with the recommendations and specific drawing details. 8. Work shall be limited to normal business hours only, unless prior approval is requested, and granted. 9. Contractor shall be responsible for securing all materials staging areas and permits required to perform the work. 10. Due to the anticipated delay in production, and delivery, of certain construction materials required to complete this project, if manufacturing and delivery of construction materials is greater than 30 days, the Contractor shall provide written notification from the manufacturer and request a change order to the contract time. 11. Work shall be completed within 30 calendar days. Work includes furnishing all materials, labor, and equipment necessary and required for the completion of the application of roofing, internal, and external components as indicated on the construction drawings and specified herein. The scope of work includes, but is not necessarily limited to, the following items: |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |