Similar Projects
Winton Circle Drainage Improvements
Bidding
$800,000 est. value
FL 32086

Metal Culverts
Bidding
FL

Canal Maintenance Services
Term Contract
Post-Bid
Miami, FL 33128

Windle Lane Stormwater Pond
Post-Bid
Daytona Beach, FL 32100

CBJTC Precinct Road North Culvert Replacement
Results
Less than $500,000 est. value
Starke, FL 32091

CBJTC Gulfport Street Washout Repair
Results
Less than $420,000 est. value
Starke, FL 32091

Babcock Ranch 2021 Spine Roads
Bidding
FL

FY19 Seawall Restoration at Marina Drive - 56th Street
Post-Bid
$160,000 est. value
Holmes Beach, FL

SE Florida Sediment Morphodynamics
Results
Everglades, Lake Worth, Miami, Palm Beach, FL 32207

Infrastructure Construction and Maintenance
Term Contract
Bidding
Less than $30,000,000 est. value
Stuart, FL

Design and Construction of Concrete Hurricane-Resistant Screen Wall at Miami Job Corps Center
Post-Bid
$250,000 to $500,000 est. value
Miami Beach, FL 33056

Install Seawall Cap on Existing Seawall
Results
$70,000 est. value
New Port Richey, FL 34568

Drainage
Bidding
Less than $400,000 est. value

Retention Wall Repairs at Laurel Oaks Reclaimed Water Storage Ponds
Post-Bid
Less than $25,000 est. value
Sarasota, FL 34240

Drainage Improvements for Third, Fourth, Fifth and Sixth Street BMP 3 and 4
Results
$328,559 est. value
Belleair Beach, FL 33786

Last Updated 04/29/2021 07:04 AM
Project Title

Putnam County East Drainage Project - Phase I and II

Physical Address View project details and contacts
City, State (County) FL   (Putnam County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work for Phase I shall include the replacement of the existing 18” corrugated metal pipe measuring approximately 42 lineal feet in length, installation of approximately 155 lineal feet of 18” HDPE pipe, 65 lineal feet of sand cement rip rap endwall, placement of temporary soil erosion and pollution control and maintenance of traffic. The work for Phase II shall consist of, but not limited to, the cleanup of storm debris in the designated drainage system (drainage ditch, channel, canal, waterway, etc.) areas to restore creek and canals to pre-storm conditions and flows, by the removal and disposal of fallen trees, stumps, logs, brush, vegetation, blockages, rubbish, debris, small amounts of sedimentation and other items, deposited in and adjacent to the channel, that are blocking the stream flow.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents