Similar Projects
Southport Business Park - Phase I Infrastructure
New Construction - 675,000 SF
Conception
$2,750,000 est. value
Washington, PA 15301

Apex's North America Production Site
New Construction - 100,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
North Charleroi, PA 15022

Lanco Sheds
New Construction - 51,500 SF
Design
$1,500,000 est. value
New Holland, PA 17557

Flint Hill Farms Distillery
New Construction, Addition - 4,493 SF
Design
$600,000 est. value
Landenberg, PA 19350

Glass Studio / Residence
Renovation - 5,542 SF
Sub-Bidding
$1,000,000 to $5,000,000 CJ est. value
Pittsburgh, PA 15201

Medical Marijuana Growth and Processing Facility
New Construction - 54,000 SF
Post-Bid
$15,000,000 est. value
Olyphant, PA 18447

Citterio USA Dry Aging Facility
Addition - 57,132 SF
Post-Bid
$4,000,000 to $6,000,000 est. value
Freeland, PA 18224

Former Weatherly Steel Mill Remediation Project
Demolition
Results
Weatherly, PA

Medical Marijuana Growing and Processing Facility
New Construction - 85,700 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Duncannon, PA 17020

DFA New Wilmington Raw Receiving Renovation
Renovation - 6,100 SF
Construction
New Wilmington, PA 16142

Seakeeper Inc Expansion
Renovation - 180,000 SF
Pending Verification
Mohnton, PA 19540

Victaulic
New Construction - 400,000 SF
Pending Verification
$10,000,000 CJ est. value
Easton, PA 18045

Thermo Fisher Scientific
New Construction - 47,045 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Millersburg, PA 17061

Building 100
New Construction - 100,850 SF
Design
$1,000,000 est. value
Lancaster, PA 17601

Citterio USA Refrigerated Warehouse
New Construction - 40,745 SF
Post-Bid
$3,000,000 to $4,000,000 est. value
Freeland, PA 18224

Last Updated 06/03/2021 02:59 PM
Project Title

Risser Grain

Physical Address View project details and contacts
City, State (County) Holtwood, PA 17532   (Lancaster County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant
Contracting Method General Contractor to Subcontract.
Project Status Seeking Site Plan Approvals
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Manufacturing/Processing Plant, 8,486 SF New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Specialty Doors and Frames, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment, Laboratory Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents