Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

Wholesale Transmission Main Extension Schedule H Spanaway Extension
Infrastructure
Bidding
$907,000 est. value
Lakewood, WA

112th Street Southwest Water Main Replacement
Infrastructure
Post-Bid
$757,255 est. value
Lakewood, WA 98499

39th Avenue Southwest Phase 4 Halcyon Water Main Replacement
Infrastructure
Post-Bid
$388,000 est. value
Lakewood, WA 98499

Water Main Replacement Phases 2 and 3
Infrastructure
Results
Puyallup, WA 98371

Toscanos Sinkhole Repair and Drainage
Infrastructure
Results
$550,000 to $650,000 est. value
Puyallup, WA

Frontier Park Horse Arena Cover
Alteration
Post-Bid
$1,600,000 est. value
WA

JBLM North Access Improvement
Infrastructure
Results
$12,000,000 est. value
Lakewood, WA

SR 161 / Washington Avenue North Corridor Streetscape Phase 2
Infrastructure
Post-Bid
$2,300,000 to $2,500,000 est. value
Eatonville, WA 98328

Wastewater Eductor Decant Facility Pipeline
Infrastructure
Results
$800,000 est. value
Tacoma, WA

24th Street East Utility Relocation
New Construction, Infrastructure
Post-Bid
$3,000,000 to $3,750,000 est. value
Sumner, WA 98352

Kansas Street Southwest Outfall Replacement and Calistoga Street West Improvements Project
Infrastructure
Results
$350,000 est. value
Orting, WA 98360

Summit Avenue Water Main Replacement
Infrastructure
Post-Bid
$300,000 est. value
Fircrest, WA 98466

Town Center - Utility and Woonerf Project
Infrastructure
Results
$5,000,000 to $6,100,000 est. value
Sumner, WA

2022 Utilities Project
Infrastructure
Post-Bid
$1,932,000 est. value
Buckley, WA 98321

Last Updated 06/22/2022 07:01 AM
Project Title

SR 162 East Water Main Replacement Phase 2 and 3

Physical Address View project details and contacts
City, State (County) Puyallup, WA 98375   (Pierce County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Contract provides for water main improvements within the Valley Water District. The project is located within WTSDOT right-of-way. Work will consist of furnishing and installing approximately 1,460 linear feet of 12-Inch ductile iron water main in Phase 2 and 3,530 linear feet of 12-Inch ductile iron water main in Phase 3 and all associated water system materials including water main, fittings, valves, fire hydrants, and water service materials, as well as traffic control and surface restoration.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents