Similar Projects
US Cellular Center Mechanical/HVAC Renovation
Post-Bid
Asheville, NC

PC Air Units
Post-Bid
Charlotte, NC 28208

Brinkley Building Cosmetology HVAC Upgrades
Results
Thomasville, NC

Install 10 HVAC Systems in RHA Occupied Public Housing Community
Results
Rockingham, NC 28379

McEniry HVAC and IT Infrastructure Upgrades
Construction
$10,000,000 est. value
Charlotte, NC 28223

Durham City Hall HVAC and Electrical Renovations
Post-Bid
Durham, NC

HVAC Maintenance Contract
Term Contract
Results
Less than $713,590 est. value
Dunn, Erwin, Lillington, Spring Lake, NC 27546

Cooling Tower Replacement
Post-Bid
Raleigh, NC 27610

Install 20 HVAC Systems in RHA Occupied Public Housing Community
Results
Rockingham, NC 28379

DPS - Polk Youth Institution - Chiller and Cooling Tower Replacement
Post-Bid
Butner, NC 27509

HVAC Repairs Rachel Freeman School of Engineering
Results
Less than $93,657 est. value
Wilmington, NC 28405

Carver and Webb Halls Fume Hoods Replacement
Post-Bid
Greensboro, NC

City Hall HVAC Replacement
Results
Less than $553,350 est. value
Jacksonville, NC

Diesel Exhaust System - Town of Swansboro Fire Department
Post-Bid
Swansboro, NC 28584

Noble Hall AHU Replacement
Results
Less than $365,000 est. value
Greensboro, NC

Last Updated 07/08/2021 04:18 PM
Project Title

ECSU - Chiller Replacement

Physical Address View project details and contacts
City, State (County) Elizabeth City, NC 27909   (Pasquotank County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The existing central utility plant at ECSU contains two nominal 500 ton Trane centrifugal chillers and dual cell cooling tower. This SOW includes the addition of 800-tons of cooling capacity through a new high efficiency chiller with an adaptive frequency drive and supporting infrastructure which will connect to the existing campus wide Trane Trace ES control system.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents