Similar Projects
NTP Vertical Turbine Pump Rebuild
Bidding
Brighton, CO 80603

Colorado City Artesian Well 4584-F
Bidding
Colorado City, CO

Water Right Due Diligence - Arkansas River Basin
Post-Bid
Denver, CO

Carmichael Park Vault
Post-Bid
Brighton, CO 80601

2019 Alluvial Well Improvements
Results
Less than $2,000,000 est. value
Commerce City, CO

Repair by Replacing Domestic Water Pumps B420
Results
$1,000,000 to $5,000,000 est. value
Colorado Springs, CO

Non-Potable Pond Pump Station
Construction
Brighton, CO 80601

MMAARS 6 Well Project
Bidding
Denver, CO

South Suburban Littleton Golf Course Well # 1
Post-Bid
Littleton, CO

Six Denver Basin Aquifer Wells Drilling Project
Results
Denver, CO

Directional Boring and Trenching
Bidding
Fort Collins, CO

On Call Alluvial Well Maintenance & Repair
Post-Bid
Castle Rock, CO

EC, Provide Sump Pump and Controls
Results
Loveland, CO 80537

2020 On Call Deep Well Repair
Post-Bid
Castle Rock, CO 80109

2020 Well Maintenance Project
Results
Less than $279,000 est. value
Aurora, CO 80016

Reported 01/27/2021 12:00 AM
Project Title

2021 Planned Well Rehabilitation and Well Abandonment / Denver Basin Aquifer Wells

Physical Address View project details and contacts
City, State (County) Castle Rock, CO   (Douglas County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of rehabilitating and installing new pumping equipment into Wells CR-39, CR-72R, CR-73R, CR-86, CR-117, and CR-217 as outlined in the ITB. The project also includes abandoning one inactive well, CR-31. Principal items of work include supplying all labor, tools and equipment necessary to complete the rehabilitation and installation of new pumping equipment as outlined: 1. Comprehensive well cleaning program, including sand pumping sediment from bottom of hole. 2. New submersible pump and motor per specifications outlined for each well in the Scope of Work. 3. Replacement of existing drop pipe with drop pipe per specifications or will be replaced with stainless steel.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents