Similar Projects
Lower Frew Levee Setback Design
Infrastructure
Conception
$250,000 CJ est. value
Coles Corner, WA 98826

Lower Frew Levee Setback Design
Infrastructure
Conception
$250,000 CJ est. value
Coles Corner, WA 98826

Main Street Place Development
New Construction, Infrastructure - 1,000,000 SF
Design
$380,000,000 CJ est. value
Bellevue, WA 98005

Koz on West 4th Avenue
New Construction, Infrastructure - 172,000 SF
Design
$98,800,000 CJ est. value
Spokane, WA 99204

New Transition Services Educational Facility
New Construction, Infrastructure
Post-Bid
$2,500,000 CJ est. value
Bellevue, WA 98004

RFQ D/B - Construction of ARS/WSU Plant Bioscience Research Building
New Construction, Infrastructure - 113,703 SF
Post-Bid
$89,000,000 CJ est. value
Pullman, WA 99163

Havana Well Station - Phase 1
New Construction, Infrastructure, Renovation
Results
$5,711,636 CJ est. value
Spokane, WA 99201

Lake to Sound Trail - Segment C SeaTac - Rebid
Infrastructure
Results
$6,857,857 CJ est. value
Seatac, WA 98188

Boren Avenue Office Tower
New Construction, Infrastructure - 282,700 SF
Construction
$56,000,000 CJ est. value
Seattle, WA 98101

Rosewood Commercial Park
New Construction, Infrastructure - 36,000 SF
Construction
$3,900,000 CJ est. value
Spokane, WA 99217

Chapter Buildings
New Construction, Infrastructure - 330,800 SF
Pending Verification
$88,000,000 CJ est. value
Seattle, WA 98105

Olive + Bellevue Mixed Use Development
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Seattle, WA 98122

Ontario Place
New Construction, Infrastructure - 33,600 SF
Conception
$5,800,000 CJ est. value
Olympia, WA 98501

Redmond 87
Demolition, New Construction, Infrastructure - 8,075 SF
Design
$50,000,000 CJ est. value
Redmond, WA 98052

2nd Avenue Mixed-Use Tower
Demolition, New Construction, Infrastructure
Post-Bid
$45,000,000 CJ est. value
Seattle, WA 98101

Last Updated 02/15/2024 05:05 PM
Project Title

2023 Sewer Main Replacement Project

Physical Address View project details and contacts
City, State (County) Clarkston, WA 99403   (Asotin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $1,364,986 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of three schedules replacing approximately 3 - 200 lineal feet of 6-inch and 8-inch gravity sewer through open cut and/or pipe bursting methods - replacement of approximately 1 - 000 lineal feet of 6-inch and 8-inch gravity sewer by open cut methods and Cured-in-Place Pipe (CIPP) rehabilitation of approximately 1 - 300 lineal feet of gravity sewer. The project includes replacement or rehabilitation of various manholes throughout the project schedules. project communication will be posted at the abovementioned designated website and sent to only those firms listed on the Plan Holders List. Project questions and requests to be placed on the Plan Holders List should be directed to Craig Riehle - Director of Operations via email at: criehle@asotinpud.org Craig Riehle Director of Operations Asotin County PUD.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents