Similar Projects
Stunner Bridge Repair
Renovation
Bidding
$500,000 to $1,000,000 est. value
Monte Vista, CO

Stunner Bridge Repair
Renovation
Bidding
$500,000 to $1,000,000 est. value
Monte Vista, CO

Wingo Bridge Repairs
New Construction, Infrastructure
Post-Bid
Glenwood Springs, CO

Stein Bridge Repair
New Construction, Infrastructure
Post-Bid
Aspen, CO

Park Avenue Viaduct Preventative Maintenance Phase 2
Results
$14,300,000 to $15,400,000 est. value
Denver, CO 80202

2nd Avenue Bridge Replacement
Results
Lyons, CO

Marshall Road and Creek View - Infrastructure
New Construction, Renovation
Construction
Superior, CO 80027

D/B - Annual Bridge Design and/or Build Design Program
New Construction, Infrastructure
Bidding
Strasburg, CO

I-76 Combined Projectes for Reconstruction of Roadway and Replacing Bridges
New Construction, Infrastructure
Post-Bid
$20,000,000 est. value
CO

US Business 24 at MP 0.146
Results
Less than $1,000,000 est. value
CO

Bridge Maintenance Program
Renovation
Bidding
Broomfield, CO

Z--MATOC - IMR Bridges
New Construction
Post-Bid
$10,000,000 est. value

Cherry Street and Arthur Ditch Bridge Replacement
Results
$300,000 to $400,000 est. value
Fort Collins, CO 80521

Woodbridge Siding and Decking Project
Renovation, Infrastructure
Post-Bid
$250,000 est. value
Snowmass, CO

Snake Island Bridges Refurbishment
Results
Steamboat Springs, CO

Last Updated 05/27/2022 01:14 PM
Project Title

Pine Street Bridge at Little Salt Wash

Physical Address View project details and contacts
City, State (County) Fruita, CO 81521   (Mesa County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results, Construction Start Expected November 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Fruita is accepting Statements of Qualifications and Proposals for the design and construction of the Pine Street Bridge at Little Salt Wash in the City of Fruita, Mesa County, Colorado. This project will require the successful team to design and construct the removal of the existing two (2) lane single span bridge and replace it with a three (3) lane bridge meeting the Fruita Standards for a collector road with sidewalks on both sides and a grade separated bike path along the Little Salt Wash.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents