Similar Projects
Elgin Sports Complex Improvement
Infrastructure
Bidding
$338,000 CJ est. value
Elgin, IL 60123

Elgin Sports Complex Improvement
Infrastructure
Bidding
$338,000 CJ est. value
Elgin, IL 60123

PIP-II Site Work
Post-Bid
Batavia, IL

Roadway Resurfacing
Post-Bid
Saint Charles, IL

2021 Fire Hydrant Sandblasting and Painting Project
Results
Carpentersville, IL

2021 MFT and Infrastructure Road Program
Results
Less than $2,965,600 est. value

Construction Manager Services
New Construction, Addition - 73,900 SF
Construction
$9,723,643 to $12,793,669 est. value
Montgomery, IL 60538

Amazon Distribution Center and Office Warehouse
New Construction - 673,186 SF
Construction
$100,000,000 est. value
Huntley, IL 60142

Discount Tire Distribution Facility
Renovation - 326,000 SF
Pending Verification
Elgin, IL 60124

FONA International Manufacturing
Addition - 15,620 SF
Pending Verification
Geneva, IL 60134

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Chip Seal Parking Lot and Roadway Improvements
Results
Elgin, Saint Charles, IL 60175

Flora Arbor Cannabis Growing Facility
Build-Out - 56,173 SF
Pending Verification
Elgin, IL 60123

2021 Polk Avenue Roadway and Utility Improvement
Post-Bid
Carpentersville, IL

2021 Road Program
Results
$511,000 est. value
Sugar Grove, IL

Last Updated 10/03/2022 04:09 PM
Project Title

Public Works Combined Maintenance Facility Mass Grading, Site Development and Salt Storage Dome

Physical Address View project details and contacts
City, State (County) Aurora, IL 60506   (Kane County)
Category(s) Commercial, Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Warehouse/Storage, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $9,201,734 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of October 3, 2022, project was awarded to Berger Excavating Contractors awarded amount is $9,201,733.50** *The closed solicitation has been included below for reference: The City is now accepting additional questions or requests for clarification until 12:00 pm on Friday, August 12. The City of Aurora is constructing an approximately 200,000 SF public works combined maintenance facility. The scope of services to be performed under this bid package includes the mass grading, installation of onsite utilities, pavement (aggregate base and binder) for the central access road and west storage yard, and the construction of a new salt storage dome with conveyor at the approximately 26 acre, previously undeveloped site. Between Liberty Street and New York Street, just east of Sartor Lane in Aurora, IL All questions should be received by the purchasing division by 4:00 pm Thursday, July 21, 2022 so that an addendum can be issued by Monday, July 25, 2022 if required. All questions received after July 21, 2022 will not be addressed unless otherwise stated via Addendum Prequalification of Bidders as contained in Check Sheet LRS6 in the "Supplemental Specifications and Recurring Special Provisions" is required on this project. All proposals must be accompanied by a proposal guaranty as outlined in the Proposal form. The Awarding Authority reserves the right to waive technicalities and reject any or all proposals as provided in Standard Provisions for Bidding Requirements and Conditions for Contract Proposals contained in the "Supplemental Specifications and Recurring Special Provisions". Any bidder who owes the City money may be disqualified at the City's discretion. The City encourages minority business firms to submit proposals and encourages the successful contract bidder to utilize minority businesses as subcontractors for supplies, equipment, services, and construction. Submission of a bid shall be conclusive assurance and warranty the bidder has examined the plans and understands all requirements for the performance of work. The bidder will be responsible for all errors in the proposal resulting from failure or neglect to conduct an in depth examination. The Awarding Authority will, in no case be responsible for any costs, expenses, losses or changes in anticipated profits resulting from such failure or neglect of the bidder *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

200,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents