Similar Projects
RFQ Engineering - Transportation Planning Professional Consultant Services for the McHenry County 2050 Long Range Transportation Plan
Infrastructure
Conception
$500,000 CJ est. value
Woodstock, IL 60098

RFQ Engineering - Transportation Planning Professional Consultant Services for the McHenry County 2050 Long Range Transportation Plan
Infrastructure
Conception
$500,000 CJ est. value
Woodstock, IL 60098

Residences of Fox Meadows
New Construction, Infrastructure
Design
$205,000,000 CJ est. value
Nunda Township, IL 60050

McHenry County SportsPlex / Lakewood Community Center / Chicagoland Sportsplex
New Construction, Infrastructure - 150,000 SF
Design
$45,000,000 CJ est. value
Woodstock, IL 60098

2024 Richmond-Burton HS Stadium and Site Access Improvements
Renovation, Infrastructure
Bidding
$5,260,000 CJ est. value
Richmond, IL 60071

Taylor Place Apartments
New Construction, Infrastructure
Bidding
McHenry, IL 60050

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Holiday Hills/ Le Villa Vaupell Sewer Extension - Phase 1
Infrastructure
Results
$6,227,127 CJ est. value
Island Lake, IL 60042

Demolition, Clean Up, Restoration, and Legal Removal of Debris
Infrastructure, Alteration
Results
Woodstock, IL

Reconstruct the Intersection of Madison Street, South Street, and Lake Avenue
Infrastructure
Construction
$27,554,453 CJ est. value
Woodstock, IL 60098

Reconstruct the Intersection of Madison Street, South Street, and Lake Avenue
Infrastructure
Construction
$27,554,453 CJ est. value
Woodstock, IL 60098

AZE Distribution Center
New Construction, Infrastructure - 175,600 SF
Pending Verification
$19,000,000 CJ est. value
Huntley, IL 60142

South Church Street Redevelopment
New Construction, Infrastructure, Build-out - 33,100 SF
Pending Verification
$5,000,000 CJ est. value
Huntley, IL 60142

RFP - Windam Cove Pollinator Habitat Restoration Project
Infrastructure
Conception
$400,000 CJ est. value
Woodstock, IL 60098

Last Updated 01/08/2024 05:07 AM
Project Title

HMA Resurfacing With Culvert Replacement, and Aggregate Shoulders on Riverside Drive

Physical Address View project details and contacts
City, State (County) McHenry, IL 60051   (McHenry County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $2,784,775 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

HMA Resurfacing with culvert replacement, and aggregate shoulders on Riverside Drive from Johnsburg Road to Running Brook Farm Boulevard in Johnsburg. Region : 1 District : 1 Federal Project # : 6YP7(599) County(S) : McHenry Key Route(S) : FAU 156 Marked Route(S) : Riverside Drive Section(S) : 20-00016-00-RS (JOHNSBURG) State Job #(S) : C-91-078-22 PPS #(S) : 1-22453-0000 80 Working Days Questions not accepted as of September 12, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time ,September 01, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 084 - HMA Resurfacing With Culvert Replacement, and Aggregate Shoulders on Riverside Drive 0-91-078-22

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents