Similar Projects
A2 North Maple
New Construction - 1,800 SF
Conception
Ann Arbor, MI 48103

Sakura Asian Village
New Construction - 47,477 SF
Design
$50,000,000 to $60,000,000 est. value
Novi, MI 48375

Brightdawn Village Condominiums
New Construction - 956,000 SF
Design
$32,000,000 est. value
Ann Arbor, MI 48104

11160 Madison Heights Civic Center Campus Project Bid Package 3
Renovation, Alteration
Bidding
$359,119 est. value
Madison Heights, MI 48071

Filmore Place - Phase I and Phase II
New Construction - 154,000 SF
Post-Bid
Canton, MI 48187

Newton Place
New Construction - 105,849 SF
Post-Bid
$10,000,000 CJ est. value
Okemos, MI 48823

West Currie Clubhouse Crawl Space
Results
Midland, MI

Scharf Clubhouse Patio Expansion
Addition - 2,000 SF
Results
$200,000 to $250,000 est. value
Rochester, MI 48309

Advia Credit Union Administration Building
New Construction - 150,000 SF
Construction
$26,000,000 est. value
Oshtemo, MI 49009

Residences at River Trail
New Construction - 696,000 SF
Construction
$18,000,000 to $20,000,000 est. value
Auburn Hills, MI 48321

The Reserve at Crystal Lake - Single Family Homes
New Construction
Pending Verification
Commerce Township, MI 48382

820 Sixteen
New Construction - 3,500 SF
Pending Verification
Holland, MI 49423

West Village of Brighton Townhomes
New Construction
Design
Brighton, MI 48116

Lost Lake Woods Club New Freight Elevator
Renovation
Post-Bid
Lincoln, MI 48742

Booker T. Dozier Renovations
Renovation
Results
Inkster, MI 48141

Last Updated 05/19/2022 01:10 AM
Project Title

Senior Center Pavilion Repairs

Physical Address View project details and contacts
City, State (County) Taylor, MI   (Wayne County)
Category(s) Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pavilion Repairs The south end of the outdoor pavilion metal roof overhang be removed and pavilion side finished in 24ga flush panels. Color will match existing; Gutters must be altered. All debris must be removed and disposed of from the site. All rotted wood must be repaired Permits must be pulled.

Details

Clubhouse/Social Club, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents