Similar Projects
Utilizing Factory-Built Buildings to Construction 8 Stand-alone Classroom Building at South Shore Elementary School
New Construction, Infrastructure
Design
$8,400,000 CJ est. value
Albany, OR 97322

UO Retainer Program - Consulting Services - Extended Period
Renovation, Term Contract
Bidding

Architect-Engineering Services in Support of the National Energy Technology Lab
Term Contract
Post-Bid
Less than $10,000,000 est. value
Albany, OR - Pittsburgh, PA - Morgantown, WV

Engineering, Planning and Development
Post-Bid

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

Albany and Corvallis Signal Improvements - Benton and Linn Counties
Alteration
Results
$1,000,000 to $2,000,000 est. value

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

ODA Aviation Engineering Services Consulting Services (Engineering/Inspection and Ca) Airport Specific
Infrastructure
Post-Bid

Jefferson Street and First Avenue Water Line
Infrastructure
Results
$900,000 est. value
Albany, OR

Unr AE Afp Design MATOC
New Construction, Term Contract
Post-Bid
Less than $30,000,000 est. value

Eagle View and Wishram Water Line
Infrastructure
Results
$800,000 est. value
Albany, OR

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Post-Bid
Less than $98,000,000 est. value

Chicago Street Infill
Infrastructure
Results
$205,000 est. value
Albany, OR 97322

Regional A-E Environmental Services
Renovation, Term Contract
Post-Bid

Reported 07/29/2022 10:53 PM
Project Title

RFP Engineering - North Santiam Canyon Sewer Project - Mill City / Gates Basin (Project a) and Detroit / Idanha Basin (Project B)

Physical Address View project details and contacts
City, State (County) Mill City, OR 97360   (Linn County)
Category(s) Heavy and Highway, Professional Services, Sewer and Water
Sub-Category(s) Engineering, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding,
Bids Due View project details and contacts
Estimated Value $777,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Refer Questions to: Tim Beaver, Contracts Specialist Phone number: (503) 365-3100 pwcontracts@marion.or.us

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents