Similar Projects
Carkeek CSO Dechlorination System Replacement
Alteration
Design
$860,000 est. value
WA

BRPS Fish Counting Systems
Alteration
Design
$750,000 est. value
WA

Fall City Floodplain Restoration Project
Infrastructure
Bidding
$9,715,074 est. value
Fall City, WA 98024

Inductive Charging Infrastructure for Everett Transit
Alteration
Bidding
$250,000 est. value
Everett, WA 98201

Downtown Stadium - Bid Packages
Alteration
Sub-Bidding
$1,500,000 est. value
Spokane, WA

Foreign Object Debris (FOD) Mats
Term Contract, Alteration
Post-Bid
Everett, WA 98201

Ductile Iron Pipe, Fittings, Couplings, Pipe Restraints and Grip Rings
Term Contract, Alteration
Post-Bid
Bellingham, WA 98229

Northwestern Division Crane Multiple-Award Task Order Contract (MATOC)
Results
$2,000 to $99,900,000 est. value

Northwestern Division Crane Multiple-Award Task Order Contract (MATOC)
Results
$2,000 to $99,900,000 est. value

Mitigation Fairwood - 4 Phase - 2 Molasses Creek
Infrastructure
Design
WA

Mobile Showers, Restrooms, Laundry Units
Term Contract
Bidding
Vancouver, WA

Snow Removal Equipment
Infrastructure
Post-Bid
WA

Marine Cell Fender Procurement Berth 17
Infrastructure
Results
$176,250 to $194,785 est. value
Vancouver, WA 98687

Lake Hills Interceptor Phase II
Alteration
Design
$13,330,000 est. value
WA

Sheet Steel Storage Rack
Term Contract
Bidding
Bremerton, WA 98314

Reported 04/13/2022 12:00 AM
Project Title

VSD Transportation Underground Lift Removal and Soil Remediation

Physical Address View project details and contacts
City, State (County) Vancouver, WA 98661   (Clark County)
Category(s) Environmental, Single Trades
Sub-Category(s) Equipment, Wetlands/Remediation
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center - 03/16/22
Owner View project details and contacts
Architect View project details and contacts
Description

General Contract to remove an inactive, leaking underground lift to replace it with a new aboveground lift. Lift procurement and replacement will be completed under a separate contract. Additional tasks include the removal of oil-contaminated soil and groundwater (as well as free product) related to the leaking lift, and rehabilitation of the site.

Details

Division 02 - Existing Conditions, Environmental Assessment, Natural Environment Assessment, Water Remediation.
Division 11 - Equipment.
Division 32 - Exterior Improvements, Wetlands.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents