Similar Projects
SIP 12-22-SI4
Infrastructure
Bidding
$7,500,000 to $9,999,999 est. value
PA

Majestic Drive Utility and Restoration Project
Post-Bid
Canonsburg, PA 15317

Pavement Maintenance on Various Roads Fiber Reinforced Seal Coat
Post-Bid
Canonsburg, PA

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

2020 Pavement Maintenance On Various Roads Milling and Resurfacing
Results
Canonsburg, PA 15317

West Walnut Street Improvements
Post-Bid
Washington, PA 15301

Pavement Maintenance on Various Roads Fiber Reinforced Seal Coat
Results
Canonsburg, PA 15317

Contract A - Pavement Maintenance on Various Roads Throughout the Township
Post-Bid
Cecil, PA

8000 SY Bituminous Seal Coat
Results
Prosperity, PA 15329

Contract B - Pavement Maintenance on Various Roads Throughout the Township
Post-Bid
Cecil, PA

SIP 12-20-SI4-1
Results
$2,500,000 to $4,999,999 est. value
PA

Aggregate Material
Post-Bid
Washington, PA

2020 Road Improvements Project
Results
Washington, PA 15301

2021 Pavement Maintenance Program Contract A, B
Post-Bid
Houston, PA

2020 Wilson Street Paving Project
Results
West Brownsville, PA 15417

Reported 02/19/2022 12:00 AM
Project Title

Laurel Drive/Maplewood Drive Roadway Improvements

Physical Address View project details and contacts
City, State (County) McMurray, PA 15317   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work generally consists of 2,860 square yards of roadway milling and profiling, Superpave WMA binder course, and Superpave WMA wearing course; base repair; traffic control; bituminous wedge curb; concrete curb; adjustment of manholes and storm inlets to grade; adjustment of valve boxes to grade, Type M and C inlets; 6" PVC, 12", 15" and 18" CPP storm sewer; storm manhole; driveway adjustments and all necessary appurtenances and restoration for said construction.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents