Similar Projects
Asphalt Resurface and Bridge Replacement
New Construction, Infrastructure
Bidding
IN

Road Reconstruction
Infrastructure
Bidding
IN

Asphalt Crack Sealing
Post-Bid
Elkhart, IN

2021 Asphalt Paving – Phase 1
Infrastructure
Post-Bid
Middlebury, IN

Ace Cab Parking
New Construction, Demolition
Results
Elkhart, IN 46516

Intersection Improvement and Traffic Signals
Results

2022 CCMG Paving Program
Infrastructure
Bidding
Goshen, IN

2021 Crack Seal Roadway Maintenance
Infrastructure
Post-Bid
Nappanee, IN

IDIQ Pavement Patching
Results

2021 Microsurface Roadway Maintenance
Infrastructure
Post-Bid
Nappanee, IN

2021 Concrete Roadway Repair
Results
Goshen, IN

County Road 17
Infrastructure
Post-Bid
Elkhart, IN

2021 Asphalt Paving
Results
Goshen, IN

Franklin Street Resurfacing CCMG
Infrastructure
Post-Bid
Elkhart, IN 46516

CR 38 - CR 31 to CR 35 Reconstruction
Results
Elkhart, IN

Last Updated 03/04/2022 02:45 PM
Project Title

2021-1 Community Crossing Resurfacing

Physical Address View project details and contacts
City, State (County) Millersburg, IN   (Elkhart County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Projects generally consist of a pavement resurfacing of variousroads within the Town of Millersburg.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents