Similar Projects
Choteau, 1st Street South to 3rd Street West - City of Hardin
Infrastructure
Conception
$253,400 CJ est. value
Hardin, MT 59034

Choteau, 1st Street South to 3rd Street West - City of Hardin
Infrastructure
Conception
$253,400 CJ est. value
Hardin, MT 59034

MT BOR NPS 2021(1), Yellowtail Dam Area Road Improvements
Infrastructure
Design
$15,000,000 CJ est. value
Lodge Grass, MT 59050

MT BOR NPS 2021(1), Yellowtail Dam Area Road Improvements
Infrastructure
Design
$15,000,000 CJ est. value
Lodge Grass, MT 59050

Raw Water Intake, Pump Station, and Pipeline
New Construction, Infrastructure, Renovation
Post-Bid
$50,000 CJ est. value
Fort Smith, MT 59035

Raw Water Intake, Pump Station, and Pipeline
New Construction, Infrastructure, Renovation
Post-Bid
$50,000 CJ est. value
Fort Smith, MT 59035

Jackson Creek Road Improvements
Term Contract
Results

Water Main Extension Watson Drive - City of Hardin
Infrastructure
Conception
$366,484 CJ est. value
Hardin, MT 59034

Drainfields
Infrastructure
Post-Bid
$250,000 CJ est. value
Crow Agency, MT 59022

Landfill - Site for New Coal Ash Cell - City of Hardin
Infrastructure
Conception
$2,000,000 CJ est. value
Hardin, MT 59034

RFQ Construction Manager at-Risk - CMAR Professional Services - Design and Construction of the Phase 3 Elementary School Addition
Addition, Demolition, Infrastructure
Post-Bid
$2,300,000 CJ est. value
Pryor, MT 59066

Crow 18-Plex Apartment Building
New Construction, Infrastructure - 26,000 SF
Post-Bid
$10,000,000 CJ est. value
Crow Agency, MT 59022

MT Bighorn 46(1) Warman Loop Road
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Fort Smith, MT 59035

RFP Design - Plenty Doors Proposes to Build Two Multi-use Buildings in the Center
New Construction, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Crow Agency, MT 59022

Foundation Package for High School Academy
Infrastructure
Post-Bid
$300,000 CJ est. value
Hardin, MT 59034

Last Updated 08/24/2023 11:08 AM
Project Title

Fly Creek - 15 Miles West Hardin

Physical Address View project details and contacts
City, State (County) Lodge Grass, MT 59050   (Big Horn County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $1,109,190 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Excavation, bridge scour, sheet pile wall, riprap, and revegetation on the Fly Creek - 15 Miles West Hardin project located in Big Horn County. STPB 81016(8) SEH:MH:9791000ADV-106 The Disadvantaged Business Enterprises contract goals are 0.00%. This project is under the jurisdiction of the Billings District Administrator. Uniform No. 9791000. MTDOT 106 - Fly Creek - 15 Miles West Hardin - old Hwy 87

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents