Similar Projects
Graves Golf School
New Construction
Conception
Edmond, OK 73025

Practice Facility Upgrades
Renovation
Conception
$10,000,000 est. value
Oklahoma City, OK 73195

Surface - US 54
Infrastructure, Alteration
Design
$8,000,000 est. value
Guymon, OK 73942

Utilities - US 70
Alteration
Design
$1,464,764 est. value
Kingston, OK 73439

Air Force Life Cycle Management Center WAG B9201 Project, Tinker AFB
New Construction, Infrastructure - 35,000 SF
Bidding
$25,000,000 CJ est. value
Oklahoma City, OK 73145

Wastewater System Improvements
Renovation, Infrastructure
Bidding
$61,503,195 CJ est. value
Shawnee, OK 74801

Cable Barrier, Traffic Signing and Striping - Indian Nation Turnpike
Infrastructure
Sub-Bidding
$9,073,805 CJ est. value
Hugo, OK 74743

Tulsa Classical Academy
New Construction, Infrastructure
Sub-Bidding
$1,200,000 CJ est. value
Tulsa, OK 74133

Piedmont Middle School
New Construction
Post-Bid
$16,000,000 est. value
Piedmont, OK 73078

Site Preparation Services
Term Contract
Post-Bid
Claremore, OK 74017

Sports Complex Renovations
Renovation
Results
$1,560,002 est. value
Oklahoma City, OK 73135

Gymnasium at Wilson Elementary School
New Construction
Results
$3,500,000 est. value
Oklahoma City, OK 73103

Indoor 18
New Construction
Construction
Oklahoma City, OK 73114

200 North Yukon Parkway
New Construction, Infrastructure
Pending Verification
Yukon, OK 73099

Enid Soccer Complex
New Construction
Pending Verification
Enid, OK 73703

Last Updated 07/29/2022 09:41 AM
Project Title

New Baseball/Softball Facilities - Bid Packages 1 to 15

Physical Address View project details and contacts
City, State (County) Elgin, OK 73538   (Comanche County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing Labor and Materials for the New Baseball/softball Facil- Ities: #1 Sitework (L&m) #2 Concrete (L&m) #3 Masonry (L&m) #4 Structural Steel (M) #5 Structural Steel Erection (L) #6 Roofing (L&m) #7 Joint Sealants (L&m) #8 Artificial Turf (L&m) #9 Metal Bleachers (L&m) #10 Fencing and Gates (L&m) #11 Miscellaneous Specialty Items (L&m) #12 Scoreboards (L&m) #13 Sod (L&m) #14 Electrical (L&m) #15 Utilities (L&m) Note: for a Complete De- Scription of the Bid Packages Scope, Refer to Summary of Work in the Project Manual and Alternates. A Cashiers Check, Certified Check, or Surety Bond in the Amount of (5%) of the Bid Shall Accompany the Submit- Ted Proposal of Each Bidder. The Owner Reserves the Right to Reject Any or All Bids. A. The work and materials to be furnished by this Contractor consist generally of the following items: 1. Furnish complete installation of electric service facilities, feeder wiring, panelboards, branch circuit wiring, wiring devices, and other work indicated on the drawings or called for in these specifications. 2. Grounding of the equipment of each electrical system. 3. Motors: a. Where necessary, install motor starters and VFDs. Electrical contractor shall install disconnects, motor starters, controllers and VFDs and all related power wiring and conduit as necessary for a complete and functional installation. Provide shielded cable equal to Belden classic 100% VFD cable or equal between VFD and motor. b. Where dampers or louvers with dampers are required to be interlocked with intake or exhaust fans or other similar motors, provide 120V power to the damper. Refer to mechanical plans for locations and quantities of dampers. 4. Provide 120V power to all BAS control panels. Coordinate with controls contractor for quantity and locations. 5. Furnish temporary electric power service, power distribution and lighting to construction site. 6. Unless specified otherwise, furnish power conductors, conduit, and wiring and make connections to equipment and devices installed under other Divisions and Sections. 7. Install telephone and data systems as indicated on plans. 8. All necessary drilling, cutting, and patching of walls, floors, partitions, ceilings, etc., required for the proper installation of the work under this contract shall be done at the contractor's expense in a neat, careful, and workmanlike manner and as approved by the Architect. No concrete joints, beams, girders, or columns shall be cut by the contractor without first obtaining the written permission of the Architect. All drilling and patching for expansion bolts, hangers, and other supports shall be done by the contractor subject to the approval of the Architect. The contractor shall provide fire caulking or fire stop where required as a result of electrical penetrations through fireresistant-rated walls, partitions, floors, or ceilings. Use grout to seal around electrical penetrations in non fire-resistant-rated walls, partitions, floors, or ceilings. 9. Provide concrete housekeeping pads for all ground-mounted electrical equipment such as inverters, generators, transformers, etc. Unless noted otherwise on plans, concrete pads shall be 4" tall and larger than the footprint of the equipment by at least 3" on all sides. 10. Provide uni-strut frames for equipment (such as panel boards) where it is not possible to mount directly to structure. 11. Contractor shall verify that electrical gear locations have adequate code-required clearance with other trades prior to rough-in.

Details

Division 01 - General Requirements, Construction Facilities, Execution, Erection.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Steel Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Membrane Roofing, Joint Sealants.
Division 08 - Openings.
Division 09 - Finishes, Specialty Flooring, Synthetic Turf Flooring, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Exterior Scoreboards.
Division 13 - Special Construction, Fabricated Engineered Structures, Grandstands and Bleachers.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 26 - Electrical.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates, Turf and Grasses, Sodding.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents