Similar Projects
Granite Cliffs - Master Plan
Conception
Port Deposit, MD 21245

Magnolia Manor
New Construction
Conception
Laurel, MD

Waldorf Station
New Construction - 276,200 SF
Design
Waldorf, MD 20603

Heritage Green
New Construction
Design
La Plata, MD

Housing Rehabilitation Bid – Snow Hill
Renovation
Bidding
Snow Hill, MD 21863

Cecilton Senior Villages
New Construction - 19,539 SF
Post-Bid
$640,000 est. value
Cecilton, MD 21913

Purple Line Beacon Heights Station Development Opportunity
Post-Bid
Riverdale, MD 20737

Housing Rehabilitation Community Development Block Grant
Renovation
Results
Delmar, MD

Housing Rehabilitation - Snow Hill Area of Worcester County
Renovation
Results
Snow Hill, MD 21863

Kellerton Knolls Land Bay A
New Construction
Construction
Frederick, MD 21701

Cedar Creek Phase I
New Construction
Construction
Columbia, MD 21045

Coleman Farm Residential
New Construction
Pending Verification
Millington, MD 21651

Residential Development
New Construction
Pending Verification
Salisbury, MD

Glenn Dale Commons Phase 5
New Construction - 1,821,469 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Glenn Dale, MD 20769

South Lake - Masterplan
New Construction - 560,272 SF
Design
Bowie, MD 20774

Last Updated 03/25/2020 11:54 AM
Project Title

Housing Rehabilitation - Pocomoke City

Physical Address View project details and contacts
City, State (County) Pocomoke City, MD 21851   (Worcester County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove all existing roof shingles, underlayment, flashings, and drip edge. Remove existing gutters and downspouts. Replace any water damaged roof sheathing. Provide and install minimum thirty pound felt paper underlayment. Provide and install new wide white aluminum drip edge. Install ice and water shield at all eaves, rakes, as well as all roof valleys and wall/roof junctions. Provide and install thirty year architectural shingles per manufacturer's installation instructions. Provide and install roof ridge venting with hip and ridge caps as necessary. Provide and install new plumbing vent boots as required. Install aluminum step flashings at chimney. Install new white continuous gutters and downspouts with splash blocks at each downspout. Remove crawlspace door and install new insulated metal access door. Remove all crawlspace insulation and vapor barrier. Install new R-19 Kraft faced fiberglass batt insulation in all floor joists bays in the crawlspace. Install new 6 mil poly vapor barrier in the crawlspace. Vapor barrier to have a minikum 12 inch overlap at all seams and is to completely cover the crawlspace floor area. Install metal dryer duct from the dryer unit rear connection through the crawlspace and out the exterior wall, terminating in a self closing dryer vent hood. Dryer duct to be properly supported in the crawlspace. Install GFCI outlets in the bathroom, kitchen sink area, and at the exterior. Install a bathroom exhaust fan in the bathroom ceiling and vent it to the exterior per current Code. Install State mandated 10 year life, lithium battery smoke detectors in house, including all bedrooms per current Code. If hard wiring all units would require major demolition and repairs, single battery operated units will be acceptable in the bedroom currently not having hard wired units. Replace the sliding glass door panel glass that has a failed glazing seal. The new glass is to be safety glass, as well as Low-E, insulated glass. Repair entry steps that are loose and have failed mortar joints.

Details

1 Single-Family Homes, Renovation.
Division 04 - Masonry, Common Work Results for Masonry, Masonry Mortaring.
Division 06 - Wood, Plastics, and Composites, Sheathing, Underlayment.
Division 07 - Thermal and Moisture Protection, Operation and Maintenance of Thermal and Moisture Protection, Maintenance of Membrane Roofing, Roof Removal, Dampproofing and Waterproofing, Thermal Protection, Flashing and Sheet Metal, Roof Specialties, Manufactured Gutters and Downspouts, Roof Accessories, Ridge Vents.
Division 08 - Openings, Sliding Glass Doors.
Division 26 - Electrical, Low-Voltage Distribution Equipment, Multi-Outlet Assemblies.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Division 40 - Process Integration, Process Piping and Equipment Insulation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents