Similar Projects
Essential/Emergency HVAC Services
Term Contract
Post-Bid
Milwaukee, WI

Vendor Service Contract for Essential/Emergency HVAC Services
Term Contract
Post-Bid
Milwaukee, WI 53202

Zeidler Municipal Building, 2nd Floor, Health Lab HVAC Upgrades
Results
Milwaukee, WI 53202

Unit Heater Replacement
Results
Milwaukee, WI 53216

Testing, Certification, Preventive Maintenance, and Repair Services for Fume Hoods, Clean Rooms, Biosafety Cabinets, etc.
Term Contract
Post-Bid
Milwaukee, WI

OCC Dust Collector Replacement B121
Results
Oak Creek, WI 53154

HQ Chiller Compressor Replacements and Four-Year HVAC Maintenance Services
Term Contract
Post-Bid
Milwaukee, WI 53204

Laboratory Mechanical Improvements - General
Renovation
Results
Less than $2,300,000 est. value
Milwaukee, WI 53211

HVAC and Mechanical Products
Term Contract
Post-Bid

Fire Department Chiller Replacement
Results
West Allis, WI 53214

Stainless Steel Mechanical Joint Tapping Sleeves
Term Contract
Post-Bid
Milwaukee, WI

Kinnickinnic Bus Storage Garage HVAC Replacement
Results
Milwaukee, WI 53204

Install Furnace and Central Air Unit
Post-Bid
Milwaukee, WI 53206

Wilson Park Senior Center Boiler and Exhaust Fan Replacement
Post-Bid
Milwaukee, WI 53221

2021 Time And Material Zoological Gardens
Term Contract
Post-Bid
Milwaukee, WI

Last Updated 02/18/2021 02:10 PM
Project Title

Laboratory Mechanical Improvements - MEP

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53211   (Milwaukee County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of : Demolishing five (5) air handling units, one (1) return fan, ten (10) lab exhaust fans and associated pneumatic controls; Installing two (2) variable air volume air handling units, four (4) lab exhaust fans with energy recovery system and new direct digital controls; Install new supply air, return air and lab exhaust ductwork systems on the roof and in the penthouse to support the new HVAC equipment; Installing new exhaust terminal units for labs and fume hoods being connected to the new lab exhaust fan system on floors 11-12; Replacing existing penthouse unit heaters and controls; Cleaning existing supply and return ductwork on floors 7-12; Extending existing chilled water, hot water, low pressure steam and low pressure condensate services to feed new the HVAC equipment; Test and balance of air distribution systems on floors 7-12; Installing 28 new safety showers with tempering valves; Replacing five fume hoods with low flow hoods on floor 11; Extending electrical power services to serve new equipment; Installing LED lighting in the penthouse mechanical room.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents