Similar Projects
GreenSpace Self Storage
New Construction - 140,400 SF
Design
$5,000,000 est. value
Pearland, TX 77584

Princeton Meadows Storage
New Construction - 63,421 SF
Design
$3,800,000 est. value
Princeton, TX 75407

Brinemaker Shed - Linden MNT
New Construction
Bidding
$88,000 est. value
Linden, TX

Design/Build for a Juvenile Shop Building in Arcola
New Construction - 2,000 SF
Bidding
$300,000 est. value
TX

D.A.M. Office Warehouse
New Construction - 9,983 SF
Sub-Bidding
$2,200,000 est. value
Schertz, TX 78154

Cold Storage and Overflow Facility
Term Contract
Post-Bid
San Antonio, TX 78208

Bldg 2028 Warehouse Renovation Project Phase 2
Renovation
Post-Bid
San Antonio, TX 78243

Supply Support Activity (SSA) Warehouse
Results
$10,000,000 to $25,000,000 est. value
Fort Hood, TX

Storage Units
Results
San Antonio, TX 78236

Buckingham Road Development
New Construction - 38,900 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Richardson, TX 75081

Energy Rental Solutions - CAT
New Construction - 7,116 SF
Construction
$4,000,000 est. value
Pearland, TX 77581

Gap Distribution Center
New Construction
Pending Verification
Rosenberg, TX

Amazon Distribution Center
New Construction - 141,600 SF
Design
San Antonio, TX 78216

Pre-Qualification for Metal Building Manufacturers
New Construction
Bidding
TX

DFW Inland Ports 1 And 2
New Construction - 505,000 SF
Post-Bid
$10,000,000 CJ est. value
Wilmer, TX

Last Updated 04/07/2022 06:43 AM
Project Title

Equipment Shed - Albany MNT

Physical Address View project details and contacts
City, State (County) Albany, TX 76430   (Shackelford County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $88,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists a 4-bays 100'x40' rgalvanized steel pre-engineered metal building, on drilled pier foundation. The building envelope consist of galvalume metal roof and wall panels on 2 sides. major components of the work consist of site grading, drilled shafts, reinforced concrete piers, pre-engineered metal structure and bollards

Details

Warehouse/Storage, 4,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents