Similar Projects
Weber Park Renovations - 500246 - City of Roseville
Infrastructure
Conception
$3,324,869 CJ est. value
Roseville, CA 95678

Stoneridge Parcel 58 Bike Trail - Miner's Ravine to Orvietto Drive - 500262 - City of Roseville
Infrastructure
Conception
$2,330,000 est. value
Roseville, CA 95678

Wastewater Lift Station No. 5 Decommissioning - 500269 - City of Roseville
Demolition, Infrastructure
Design
$375,000 est. value
Roseville, CA 95747

Penryn Townhomes
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Penryn, CA 95663

Bickford Ranch Backbone Concrete
Alteration
Post-Bid
Lincoln, CA 95648

Paving and Striping Services
Infrastructure
Post-Bid
Roseville, CA

Replacement of Asphalt Concrete in Various Locations
Infrastructure
Results
Tahoe Vista, CA

Dutch Flat Pool Restroom & ADA Ramp
Renovation, Alteration
Results
Dutch Flat, CA 95714

Vernon Street Multi-Residential
Demolition, New Construction, Infrastructure - 2,900 SF
Construction
$8,000,000 CJ est. value
Roseville, CA 95678

Vernon Street Multi-Residential
Demolition, New Construction, Infrastructure - 2,900 SF
Construction
$8,000,000 CJ est. value
Roseville, CA 95678

Atkinson Self-Storage
New Construction, Infrastructure - 26,625 SF
Pending Verification
$3,000,000 CJ est. value
Roseville, CA 95678

Atkinson Self-Storage
New Construction, Infrastructure - 26,625 SF
Pending Verification
$3,000,000 CJ est. value
Roseville, CA 95678

Fiddyment Road Repaving Project - City of Lincoln
Infrastructure
Conception
$6,237,050 CJ est. value
Lincoln, CA 95648

Estia of Rocklin
New Construction, Infrastructure
Design
$68,000,000 CJ est. value
Rocklin, CA 95677

Material / Parts Storage Facility Project
Infrastructure, Renovation
Post-Bid
$654,000 CJ est. value
Granite Bay, CA 95746

Last Updated 06/30/2023 05:13 PM
Project Title

Joiner Parkway Pavement Rehabilitation Project Phase 2

Physical Address View project details and contacts
City, State (County) Lincoln, CA 95648   (Placer County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,857,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project will rehabilitate the roadway by performing full-depth reclamation with cement (FDR-C), correcting drainage issues by replacing some existing curb and gutter sections, upgrading all non-compliant ADA ramps across the area of Joiner Parkway, and replacing some minor concrete sidewalks. In addition, a pavement preservation treatment known as micro-surfacing will be placed from Moore Road to 108 Joiner Parkway (Joiner Pkwy Self Storage), and new traffic striping and pavement markings will be placed. Bid Bond - 10.00% Payment Bond - 100.00% Performance Bond - 100.00% Liquidated Damages : $4,000 per day Type of Award : Lump Sum The City reserves the right to postpone the date and time for opening of bids at any time prior to the date and time announced in the advertisement. The City Clerk will report the bids to the Lincoln City Council in regular session. Each bid shall be on forms provided by the City, and shall in all respects comply with the Instructions to Bidders and the Contract Documents. No Pre-Bid Conference Licensing : In accordance with the provisions of California Public contract Code section 3300, the City of Lincoln has determined that the following license classification is required to perform this project: Class A General Engineering Contractor. Wage Rates : Pursuant to Labor Code section 1770, the California Director of Industrial Relations has specified the general prevailing wage rates for the public projects in California. The wages to be paid to all workers on such projects shall not be less than those specified in such wage rate determination. Disadvantage Business Development : The DBE subcontracting goal for this project is 13%. The DBE goal will be based on the total contract amount awarded to the successful bidder, which may include any combination of bid alternates. Questions regarding the bidding documents may be directed to Edgar Garcia. His email address is Edgar.Garcia@lincolnca.gov. Any questions addressing the interpretation or clarification of the Contract Bid Forms or the Bid Documents must be submitted in writing by email not later than seven (7) calendar days before the date bids will be opened.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents