Similar Projects
Platteville High School Improvements
Renovation - 13,500 SF
Conception
Platteville, WI 53818

Facility New Construction, Additions and Renovations - 2020 Bond - Platteville Public Schools
Addition, New Construction, Infrastructure, Renovation
Conception
$36,000,000 CJ est. value
Platteville, WI 53818

Maple Road Proposed Subdivision
New Construction
Design
Jackson, WI 53037

Saint Ambrose Academy / Fitchburg
Addition, New Construction - 22,832 SF
Design
$12,100,000 CJ est. value
Fitchburg, WI 53711

Mauston School
New Construction, Renovation, Addition
Post-Bid
Lyndon Station, Mauston, WI 53948

High School Small Group Classroom
Renovation, Demolition
Post-Bid
Ashwaubenon, Green Bay, WI 54304

Tech Ed Addition and Alterations to Seymour High School
Addition
Results
Seymour, WI 54165

Oshkosh Middle School
New Construction - 229,734 SF
Results
Oshkosh, WI 54901

National Heritage Academies / Waukesha
New Construction, Infrastructure - 45,000 SF
Construction
$9,500,000 CJ est. value
Waukesha, WI 53189

Lourdes Academy
Renovation, Addition - 27,211 SF
Construction
Oshkosh, WI 54902

Giese Elementary School / New Middle School - 2020 Bond - Racine Unified School District
Demolition, New Construction
Pending Verification
$700,000 CJ est. value
Racine, WI 53403

Facility Expansions and Improvements - 2022 Bond - Eau Claire School Board
Addition, Renovation
Pending Verification
$113,060,000 CJ est. value
Eau Claire, WI 54701

New Middle School Option 2 / Waunakee Community School District
New Construction
Design
$10,000,000 est. value
Waunakee, WI

Fond Du Lac High School Interior Remodeling
Renovation
Post-Bid
Fond du Lac, WI 54935

Kiel High School Restroom
Renovation
Results
Kiel, WI 53042

Last Updated 05/11/2023 02:39 PM
Project Title

HS-MS Dishwasher Replacement

Physical Address View project details and contacts
City, State (County) Crivitz, WI 54114   (Marinette County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $110,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project entails the demolition, removal and disposal of an existing commercial dishwasher, then furnishing and installing a new commercial dishwasher. The proposed equipment must be similar in operation, size and configuration to meet or exceed the performance of the existing dishwasher. The project will be treated as a turn-key affair, and the contractor will be responsible for all scopes of work, including but not limited to all electrical, plumbing, ductwork, dampers and control wiring. The Crivitz School District, hereinafter termed CSD, is seeking proposals for the replacement of an existing commercial dishwasher at their Middle-High school location. All submissions shall be identified with the Project Name, Project Location, Date, and the Name and Address of company submitting. Submitters shall be responsible for the sealed submission being delivered to the above location before the time specified. Submissions received after the time indicated above will be rejected and returned to the submitter unopened. Delivery to a post office box does not constitute receipt of a bid. A site visit is required prior to submitting. Call the District Office at (715) 854-2721 ext. 307 to schedule a mutually convenient time and date for the visit. Failure to visit the site or failure to examine any and all Contract Documents will in no way relieve the successful contractor from the necessity of furnishing any materials or equipment, or performing any work that may be required to complete the work in accordance with the Contract Documents. INTERPRETATION Inadequacies, omissions, conflicts and clarifications shall be noticed via email to the Project Manager at least five (5) days before the submission due date. The Project Manager will maintain record of these issues and their resolution and make them available to all interested submitters. Failure to request clarification or interpretation of the drawings and specifications will not relieve the successful contractor of responsibility. Signing of the contract will be considered as implicitly denoting that the Contractor has thorough understanding of the scope of work and comprehension of the Contract Documents. AWARDANCE OF CONTRACT CSD will not award the project to any submitter who has not met all the criteria set forth in this document. CSD reserves the right to reject submissions if evidence submitted by, or investigation of, the submitting firm fails to satisfy CSD that the firm is deemed responsible and qualified to carry out the obligations of the contract and fully complete all the work described in these documents. Crivitz School District reserves the right to accept or reject any and all bids and/or proposals. SUBMISSION WITHDRAWAL Submissions may be withdrawn by written request prior to the time fixed for opening, without prejudice to the right to file a new submission. Withdrawn submissions will be returned unopened. Negligence on the part of the Submitter in preparation of his submission confers no right for withdrawal after it has been opened. No submission may be withdrawn for a period of thirty (30) days after the date set for the opening thereof. COMMENCEMENT AND COMPLETION The successful Contractor must agree to commence work on a mutually agreed upon date and to fully complete all work within (30) consecutive calendar days thereafter. COMMENCEMENT AND COMPLETION The successful Contractor must agree to commence work on a mutually agreed upon date and to fully complete all work within (30) consecutive calendar days thereafter. PLANS, PERMITS AND APPROVALS Plans, specifications and calculations that require submittal to the Wisconsin Department of Safety and Professional Services for Plan Review and Approval must be done prior to commencing work. All costs for licenses, submittals/approvals and permits and the procurement of same are the responsibility of the successful contractor. SECTION II - GENERAL GUIDELINES & REQUIREMENTS GENERAL All articles in these Guidelines & Requirements are applicable to all Divisions and Sections of the Work included herein. The Conditions of the Contract, General and Supplementary General Conditions, and these General Requirements shall apply with equal force and effect to the Contractor and all Subcontractors engaged in this work.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents