Similar Projects
Last Updated | 04/22/2021 09:03 AM |
Project Title | Phase VI Part D - Cell Preparation and Leachate Force Main Construction |
Physical Address | View project details and contacts |
City, State (County) | OH (Lake County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,293,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work covered by the plans, specifications and scope of work includes: Earthen embankment, excavation, trenching and backfill, installation of dual contained HDPE force main and manholes, abandonment of existing force main, removal and modifications of existing manholes and backfilling, electrical connections, municipal waste excavation and relocation, landfill leachate management (pumping, transportation and disposal), soil borrow area management, grading and site restoration. Additional tasks including the installation of an electric panel, pump, and a flowmeter will be executed by a pre-selected subcontractor (SAS Environmental, Inc.). |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |