Similar Projects
Roof Repair at the Haverstraw Transfer Station
Post-Bid
West Haverstraw, NY 10993

Roofing MACC
Post-Bid

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Roofing Repair and Maintenance
Post-Bid

Roof Recoating (Silicone)
Results
West Nyack, NY 10994

Building L Roof and Exterior Building Repairs
Alteration
Post-Bid
Pomona, NY 10970

Police Department Roof Replacement
Results
Orangeburg, NY 10962

Roof Repairs Firearms Training Facility
Alteration
Post-Bid
Haverstraw, NY 10927

Replace Roof, Building 35 at Nathan Kline RI
Results
$2,600,000 to $4,250,000 est. value
Orangeburg, NY 10962

Various Roof Replacements
Alteration
Post-Bid
$658,750 to $891,250 est. value
Kerhonkson, Nyack, Southfields, Stony Point, Tuxedo Park, NY 10975

Group Camp Roofs - Harriman State Park
Results
$365,000 to $375,000 est. value

DEME Roof Improvements
Results
Orangeburg, NY 10962

2021 Roof Service and Repairs
Results
Orangetown, NY

Metal Roof - Sloatsburg Salt Shed
Alteration
Results
Sloatsburg, NY

Reported 11/05/2021 12:00 AM
Project Title

Compost Storage Building Partial Roof Replacement at the Biosolids Co-Composting Facility

Physical Address View project details and contacts
City, State (County) Hillburn, NY 10931   (Rockland County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency - 10/12/21
Owner View project details and contacts
Architect View project details and contacts
Description

Partial replacement of the existing metal roof panels (and associated rake end caps) on the Compost Storage Building at the Rockland Green Biosolids Co-composting Facility located at 420 Torne Valley Road, Hillburn, New York 1. Temporary removal of existing lightning protection system and reinstallation of the existing lightning protection system after installation of the new roof panels. 2. Removal and Disposal of Existing Roof Panels and rake end caps to the limits shown on the Contract Drawings (approximately 150 ft x 90 ft). Rockland Green strongly encourages recycling of all metals. 3. Furnish and Install New Roof Panels and rake end caps to the limits shown on the drawings, including new flashing (if required), fasteners, bolts, clips, sealants, galvanic protection, and all appurtenances. a. Existing panel sizes, thicknesses, and type of panels are shown on the drawings or described in the specifications. Rockland Green’s intent is to replace in kind or use materials of equivalent size and performance. b. All proposed materials and products to be used by the Proposer shall be submitted to Owner’s Engineer for approval as part of the shop drawing submittal process. c. Galvanic protection shall be applied to the top of the existing purlins prior to installation of the new roof panels (refer to drawings and specifications).

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents