Similar Projects
Cedar Rock State Park New Fueling Station
Infrastructure
Results
Independence, IA 50644

Pikes Peak State Park Fueling Station Replacement
Infrastructure
Results
$70,000 est. value
McGregor, IA 52157

10 Inch Gas Distribution Main, Meredith/Northwest 10th Street
Infrastructure
Results
Waukee, IA

New DRS & Gas Main at PW
Infrastructure
Conception
$250,000 est. value
Waukee, IA

Gas Main Line - Waukee
Infrastructure
Conception
$500,000 est. value
Waukee, IA

New 6" MDPE from T Ave/Univ to south side I80
Infrastructure
Conception
$2,355,000 est. value
Waukee, IA

CO2 Tank Improvements
Infrastructure
Results
Burlington, IA

Fuel Facility DEF System
Infrastructure
Results
Less than $87,000 est. value
Iowa City, IA 52240

2021-2022 Landfill Gas Collection System Expansion
Infrastructure
Results
$648,000 est. value
Iowa City, IA 52246

Replace Fuel Tanks
Alteration
Results
Cedar Rapids, IA 52403

Decant Tank Rehabilitation - 6150057 - City of Cedar Rapids
Infrastructure
Conception
$1,400,000 est. value
Cedar Rapids, IA

Alcoholic Beverages Division Fuel Tank and Island Replacement
Infrastructure
Post-Bid
Ankeny, IA 50021

Plumbing for Two (2) Calcium Chloride Tanks
Infrastructure, Alteration
Results
Davenport, IA 52807

Last Updated 07/06/2022 07:34 AM
Project Title

New Aviation Fuel Bulk Storage and Loading/Unloading Facilities

Physical Address View project details and contacts
City, State (County) Cedar Rapids, IA   (Linn County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,950,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of construction of an above ground aviation fuel bulk storage and loading/unloading facilities. Improvements include six 50,000 gallon Jet-A tanks, a 6,000 and 12,000 gallon Diesel tank, a 6,000 and 12,000 gallon Gasoline tank, loading, unloading, dispensing, electrical and mechanical infrastructure and associated sitework including excavation and grading, storm sewer, water main, sanitary sewer, Portland Cement Concrete pavement, traffic control, seeding and fertilizing. Prospective bidders are hereby advised that the quantities indicated herein are approximate and are subject to change per Section 40 of the General Provisions.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents