Similar Projects
Replace Waterline - General
Infrastructure
Bidding
Less than $100,000 est. value
Centralia, IL 62801

Main Street Alley Water Main Improvements
Infrastructure
Bidding
$935,682 est. value
Ladd, IL

Condition Assessment of Water Distribution System Valves
Term Contract
Post-Bid
Washington, IL

Glenside Water Main - Site Utilities
Post-Bid
Glendale Heights, IL 60139

Dogwood Street Water Main Replacement
Results
$1,000,000 to $5,000,000 est. value
Park Forest, IL 60466

DNR Eagle Creek ADA Hydrant Replacement
Results
Findlay, IL 62534

Vetter Road Segment II Roadway Reconstruction & Realignment Drainage Improvements
Addition
Construction
Joliet, IL

Construction Observation Services for the Water Main Replacement
Infrastructure
Bidding
$510,000 est. value
Northbrook, IL

On-Call Emergency And Routine Water System Repair Services
Post-Bid
Broadview, Westchester, IL 60155

2020 High Capacity Inlet Replacement Program
Results
Carpentersville, IL

Water Main Valve Exercising
Term Contract
Post-Bid
Orland Park, IL

Watermain Looping
Results
Neponset, IL 61345

Purchase and Delivery of Fire Hydrant(S), Auxilary Valve(S), and Accessories
Post-Bid
Des Plaines, IL

Schmale/St Charles/Geneva Roads Water Main
Results
Less than $3,340,065 est. value
Carol Stream, IL 60188

Vernon Hills West Pump Station Force Main Analysis for Lake County
Post-Bid
Waukegan, IL

Reported 02/11/2022 12:00 AM
Project Title

Water Service Line Pothole (FY23&24)

Physical Address View project details and contacts
City, State (County) Springfield, IL   (Sangamon County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

DESCRIPTION OF PROJECT The project consists of vacuum excavating approximately 10,000 suspected lead service lines in the Springfield area to identify both the utility owned and customer owned service line material types. The State of Illinois EPA requires an initial material inventory by April 15, 2022 and a complete material inventory no later than April 15, 2024. This will be a combined effort with both CWLP staff and a Contractor. Contractor will vacuum excavate to verify the service line material on both the city side and the customer side. The city owned portion of the service line will be potholed within a grass or gravel area, but as close to the water main as possible. The customer owned portion of the service line will also be potholed within a grass or gravel area, but as close to the property line as possible. CWLP staff will document the material type at each pothole location. Addresses will be skipped if the service line cannot be potholed in a grass or gravel. Alternate Bid: The Contractor will protect excavations prior to final backfill. All excavations will be backfilled to grade with sand by the Contractor.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents