Similar Projects
SR 110 C and D / Industrial Waste Landfill Cell 8A Construction
Alteration
Bidding
Woodbine, GA 31569

Municipal Solid Waste Landfill Cells 20-25
Alteration
Bidding
Lyons, GA 30436

Curbside MSW Collection Service
Post-Bid
Homeland, GA 31537

Environmental Monitoring Services
Post-Bid
Columbus, GA 31902

Extension to an Existing Methane Venting Trench (MVT)
Results
McDonough, GA 30253

Sharon Park Landfill Access Road Improvements
Results
Savannah, GA 31416

New Transfer Station
New Construction
Construction
Less than $2,635,000 est. value
Alpharetta, GA

Landfill Post Closure Services
Term Contract, Alteration
Bidding
Atlanta, College Park, GA 30349

Landfill Earthen Material Services Annual Contract
Term Contract
Post-Bid
Jonesboro, GA 30236

Water Clarifying Unit - Hall County Landfill
Results
Gainesville, GA 30501

Repair Plan for The Highway 49 North 3 Landfill
Post-Bid
GA

Replacement Candlestick Flare Station (CSFS)
Results
Albany, GA 31702

Phase I (MSW) - Waste Mining and Phase III (C&D) - Cell Nos. 9 & 10
Post-Bid
Thomasville, GA

Landfill Scale
Results
Less than $82,000 est. value
Claxton, GA 30417

SR 247 MSW Landfill Phase 6 Stage 1B Construction
Post-Bid
Kathleen, GA 31047

Last Updated 06/08/2021 08:46 AM
Project Title

Deans Bridge Road MSW Landfill 2020 Phase IIC Closure and Phase III Partial Closure

Physical Address View project details and contacts
City, State (County) Augusta, GA 30901   (Richmond County)
Category(s) Environmental
Sub-Category(s) Landfill
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project general description consists of providing all labor, materials, tools, equipment, services, and incidentals and performing all work required for the construction of a geosynthetic closure cover system over Phase IIC, approximately 39.9 acres, and a portion of Phase III, approximately 18.3 acres. This includes, but is not limited to: waste excavation and earthwork, geosynthetics liner system subgrade preparation over approximately 58.2 acres, installation of landfill gas collection components to be integrated into the existing active landfill gas collection system, installation of a geosynthetics liner system over approximately 58.2 acres, integration of existing and installation of new stormwater management system components, approximately 4,100 linear feet of existing roadway restoration and 4,000 linear feet of new roadway installation, and installation of temporary and permanent sediment and erosion control features to be maintained throughout the life of the project expected to be disturbed as part of the work. As part of the general requirements, portions of roadway restoration will need to be performed during non-operational hours at the Deans Bridge Road Landfill.

Details

Division 02 - Existing Conditions, Landfill Construction and Storage.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents