Similar Projects
Henningsen and Millennium Parks Baseball Fencing Repair/replacement Project
Alteration
Bidding
Northville, MI 48168

Fencing Services and Material
Post-Bid
Dearborn Heights, MI 48125

Fence Replacement
Post-Bid
Westland, MI

Marv Gans Community Park Dog Park Fencing
Results
Northville, MI 48168

Marv Gans Community Park Outfield Fencing
Results
Northville, MI 48168

Security Gate Installation
Alteration
Post-Bid
Dearborn Heights, MI 48127

Turnstile, Gate, Gate Operations and Fence Preventive Maintenance, Inspection, Parts/Repairs
Term Contract
Results
Detroit, MI

As-Needed Row Fence Repair Within Wayne County
Alteration
Post-Bid
MI

Fence Supplies & Repairs
Results
Wayne, MI

As-Needed Gate Repairs at PD
Term Contract
Post-Bid
Dearborn, MI 48126

Fence Replacement
Results
Westland, MI

Wooden Stakes
Term Contract
Post-Bid
MI

Fence at Centennial Farm
Results
Grosse Ile, MI 48138

Fencing Capital Improvement Program
Alteration
Post-Bid
Detroit, MI

2021 Fence Removal and Replacement
Results
Wayne, MI

Reported 02/18/2022 12:00 AM
Project Title

Chain Link Fence and Installation at Metro South Post

Physical Address View project details and contacts
City, State (County) Taylor, MI 48180   (Wayne County)
Category(s) Single Trades
Sub-Category(s) Fencing
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide and Install Chain Link Fence: Fence must be approximately 800 lineal feet of 9-gauge black vinyl chain link fence. Fence height must be 6 foot in height. Fence Posts must be spaced every 10 feet. Project must include three gates, 12 feet wide each (two automatic gates and one manual gate). Automatic gates must be operated via keypad. Automatic gates will require gate exit loop wiring for exiting. Contractor will be required to secure a permit through the City of Taylor for Fence project. Contractor will be required to secure any applicable permits through the State of Michigan, Department of Licensing and Regulatory Affairs (LARA). Installation to occur within 60 days after the Contractor receives the Purchase Order. Operational testing of all equipment, including gates and keypads, must be conducted by Contractor to ensure proper function and operation prior to turning system over to MSP.

Details

Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents