Similar Projects
Ust Cleaning, Inspection, Repair & Lining
Term Contract
Bidding
WA

Oil Water Separators Maintenance Contract
Infrastructure
Post-Bid
Tacoma, WA 98433

Above Ground Storage Tank Internal Inspection
Term Contract
Post-Bid
Yakima, WA 98901

Well No. 6
Alteration
Results
$2,189,000 est. value
College Place, WA 99324

Mcmillin Reservoir Onsite Septic System Holding Tank Construction for Comfort Station
Infrastructure
Results
WA 98374

Actuator Replacement Project Fabrication
Alteration
Post-Bid
Richland, WA

Terry Cargil Reservoir
Infrastructure
Results
$9,900,000 to $12,050,000 est. value
Lacey, WA

Hanford Integrated Tank Disposition Contract
Alteration
Post-Bid
WA

Underground Storage Tank Cleaning Inspection and Lining Work Order 2022-2023
Infrastructure
Post-Bid
WA

Installation of a Tank and Fire Pump to Build
Infrastructure
Post-Bid
Pasco, WA

Water Storage Tank Inspection/Cleaning
Term Contract
Post-Bid
Toppenish, WA

Reported 03/30/2022 12:00 AM
Project Title

Oak Street Reservoir

Physical Address View project details and contacts
City, State (County) Bingen, WA 98605   (Klickitat County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $980,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Construct a new 318,600-gallon glass-fused to bolted steel reservoir to replace the existing 250,000-gallon welded steel reservoir. Work to include construction of a new reservoir with appurtenances and piping, demolition of existing reservoir, erosion control, site piping, storm facilities, electrical, controls, and telemetry, chemical metering, wellhouse modifications, gravity retaining wall, fencing, site grading, and restoration.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents