Similar Projects
NTP Vertical Turbine Pump Rebuild
Bidding
Brighton, CO 80603

MMAARS 6 Well Project
Bidding
Denver, CO

Carmichael Park Vault
Post-Bid
Brighton, CO 80601

Bhs Stadium Lighting Contractor Services
Post-Bid
Brighton, CO 80601

Playground Lights
Results
$150,000 to $200,000 est. value
Brighton, CO 80601

Electrician Services
Term Contract
Results
Thornton, CO

Non-Potable Pond Pump Station
Construction
Brighton, CO 80601

Misc. Electrical and Lighting
Bidding
Brighton, Denver, CO 80216

Recapitalization of Utilities Load Centers & UPS EE-FF-GG
Post-Bid
$10,000,000 to $25,000,000 est. value
Aurora, CO 80017

2019 Alluvial Well Improvements
Results
Less than $2,000,000 est. value
Commerce City, CO

Generators
Post-Bid
Aurora, CO 80011

Zone 3 Booster Pump Station Electrical Upgrades Project, Phase 2
Results
Aurora, CO

On-Call General Construction Services
Term Contract
Post-Bid
Brighton, CO 80601

SB267 Repairs/ Upgrades to Mechanical and Electrical Systems-Three Troop Offices / Adams
Results
$158,200 est. value
Commerce City, CO 80022

Recapitalization of Utilities (Recap 3)
Post-Bid
$250,000,000 to $500,000,000 est. value
Aurora, CO

Reported 04/29/2020 12:00 AM
Project Title

CU Denver Building Add Domestic Water Pump

Physical Address View project details and contacts
City, State (County) Aurora, CO 80045   (Adams County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Electric, Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $250,000 to $300,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes a newly enclosed pump equipment room on garage level P-2 to house a domestic water pressure boosting pump, and electric unit heater. New pressure reducing valves are provided at each domestic cold water floor distribution branch from the primary cold water riser system, and a new electrical conduit and feed to serve new equipment, lighting, and space conditioning equipment on level P2.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents