Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Phillips Event Center Electrical
Alteration
Bidding
Bryan, TX 77802

Purchase of Three Phase Pad-Mount Transformers
Term Contract
Bidding
College Station, TX

Electrical Maintenance and Repair Services for the TxDOT Bryan District
Term Contract
Post-Bid
Bryan, TX 77803

5D4m-Replace Hospital Power Lines
Post-Bid
$25,000 to $100,000 est. value

Lighting Improvement Project
Results
Less than $996,199 est. value
College Station, TX 77845

Three Phase Transformer Purchase Installation Spring Creek Substation
Results
College Station, TX 77842

Transformer Testing and Maintenance on Switching Blades
Post-Bid
Falcon Heights, TX

Upgrade Electrical Distribution and Lighting Panels in Buildings 1 & 2
Results
$250,000 to $500,000 est. value
College Station, TX 77845

Facility A/C Bacnet Repair
Post-Bid

Annual Price Agreement for Generator Preventive Maintenance and Repair Services
Term Contract
Results
College Station, TX 77842

Annual Price Agreement for Distribution Conductor
Post-Bid
College Station, TX 77842

BTU Distribution Pole Reinforcement 2020
Term Contract
Results
Bryan, TX 77803

On Site Transformer Repairs and Painting
Term Contract
Post-Bid
College Station, TX

TVMDL (Former) - DM 2021 MEP
Results
Less than $434,510 est. value
College Station, TX 77843

Last Updated 12/03/2021 07:40 AM
Project Title

Capacitor Bank Controller Replacement

Physical Address View project details and contacts
City, State (County) College Station, TX   (Brazos County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $119,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Four (4) SCADA Ready ZVC Pad Mount Capacitor Bank Control System The above includes: 1. Existing Switches and Control Removal 2. 3x Eaton ECS 15 kV, 200 amp ZVC Switches 3. Valquest Systems ZV3 ZVC Capacitor Control (No substitutions – must match existing) 4. Ethernet over Fiber Optics to Control Room 5. Custom Switch Bracket 6. Turnkey Installation and Commissioning 7.Engineering Services 8. Companion Software allowing operation from Control Room Computers VAr-Min ZV3 (ZVC) Controller ZV3 with Fiber Converter Switch (Eaton/Cooper ECS ZVC switches) 1. Custom Switch Rack 2. Wiring Harness 3. Fiber Optic Cable 4. Non-recurring Engineering Hours a. System Analysis b. System Electrical Design c. Switch Rack Design d. Wiring Harness Design e. Drawing Generation Installation 1. Remove Joslyn VBM switches and Joslyn control 2. Rack Installation 3. Install Eaton/Cooper ECS switches 4. Install Valquest VAr-Min ZV3 Controller 5. Install wiring harness 6. Fiber Run 7. Fiber Termination Installation Assistance Installation Checkout and Verification System testing Calibration Commissioning Training.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents