Similar Projects
Culvert Pipe Replacement - Knecht Road and Northeast Area
Infrastructure
Bidding
$451,669 est. value
Palm Bay, FL 32905

Stormwater Pond Bulkhead Improvements
Post-Bid
FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Dredged Material Management Area BV-11 Construction
Results
$1,000,000 to $5,000,000 est. value
FL

Desilt and Video and Pipe Lining
Results
Less than $600,000 est. value

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Drainage Repair
Results
Less than $300,000 est. value
FL

Gramling Park Drainage Improvements
Infrastructure
Post-Bid
$202,319 est. value
Melbourne, FL 32901

Culvert Pipe Replacement - Units 2, 3, 4, 43, and 47
Results
Less than $332,362 est. value
Palm Bay, FL 32907

Golf Course Lake Bank Restoration
Infrastructure
Post-Bid
Barefoot Bay, FL

Thrush Drive Baffle Box
Results
$579,460 est. value
Melbourne, FL 32935

Grant Place Baffle Box
Infrastructure
Post-Bid
$464,231 est. value
Melbourne, FL

Malabar Road Drainage Pipe Repairs
Results
Less than $500,000 est. value
Palm Bay, FL 32907

Culvert Pipe Replacement Unit 20
Results
Less than $318,920 est. value
Palm Bay, FL 32907

Drainage Outfall Repair
Results
Less than $250,000 est. value
FL

Last Updated 12/28/2021 09:01 AM
Project Title

Lori Laine Trunkline Replacement

Physical Address View project details and contacts
City, State (County) Satellite Beach, FL   (Brevard County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This request is for a qualified firm to construct the replacement of the trunkline with a treatment/conveyance system along Lori Laine from Temple Street to Lemon Street. This project is subject to the provisions and regulations of FDEP’s Clean Water State Revolving Fund Program which requires, among others, Davis-Bacon wages and Buy America materials.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Culverts, Concrete Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents