Similar Projects
Last Updated | 04/12/2023 02:48 PM |
Project Title | Water Well No. 2 Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Sugar Land, TX 77498 (Fort Bend County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $162,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | In general, the Work consists of cleaning the existing well, and replacing the existing well pump and motor at Owner's Water Well No. 2. The work of this Contract is located at the Fort Bend County Municipal Utility District (MUD) No. 25's Water Well No. 2, located at 17159 Summer Hollow Dr, Sugar Land, TX 77498. Work under this Contract may consist of, but are not necessarily limited to, the following tasks: Mobilize equipment. . Remove existing metal cage, pumping equipment, including discharge head, line shaft bowl assembly, column assembly and motor. . Perform a pre-cleaning video survey of the entire well and present a report of the findings. . Total depth of the existing well is approximately 864 ft. . Wire brush clean the existing well's casing and liner. . Jet fill the well and remove debris from the bottom of the well. . Perform a post-cleaning CCTV survey of the well and present a report of the findings. . Total depth of the existing well is approximately 864 ft. . Furnish and install a new 1000 GPM @ 324-ft TDH well pump: . New enclosed shaft bowl assembly. . New discharge head and appurtenances. . New column assembly with suction pipe and strainer. . New 2 1/2 " x 1 1/2 " tension bearing with O-rings. . New 1/4 " stainless steel airline, complete with water level detector kit. . New 3-gallon oil reservoir complete with immersion heater and lubrication kit. . Furnish and install a newp 125 HP motor for the existing water well pump. Deep chlorinate the well prior to installation of new pumping equipment. . Install the new well pump and new pump motor, including all appurtenances. . Start-up and test the well pump and motor. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |