Similar Projects
Grease Trap Service
Term Contract
Bidding
Charleston, SC

Remove and Replace (4) Sewage Lift Station Floats
Post-Bid
Charleston, SC

Highway 52 Transmission Main and Booster Station
Post-Bid
Moncks Corner, SC

Central Berkeley WWTP Flow Diversion Phase 2 Division 1
Results
SC

Central Berkeley WWTP Flow Diversion Phase 2 Division 2
Results
SC

Low Battery Water and Sewer Main Replacement - Phase 1
Post-Bid
Charleston, SC 29401

Provide Grease Trap Cleaning Services for TTC - 2018
Results
Less than $36,025 est. value
Charleston, Hanahan, SC 29406

Pump Station 151 Upgrade
Renovation
Post-Bid
Summerville, SC 29486

2019 Pump Station Rehabilitation Projects
Results
Summerville, SC

Sullivan`S Island Wastewater Lift Station Conversions
Post-Bid
Charleston, SC 29482

Pump Station 25 and 102 Rehabilitation Projects
Results
Summerville, SC 29483

Installation of Residential Septic Systems (17 Sites)
Post-Bid
Adams Run, Charleston, Edisto Island, Johns Island, McClellanville, Ravenel, Wadmalaw Island, SC 29449

FY 19 CIPP Project
Results
SC

FY17 Pump Station R and R, PS114 and PS138
Post-Bid
Hanahan, SC 29461

Pump Station 002 Replacement
New Construction
Results
Goose Creek, SC

Last Updated 12/18/2018 05:26 AM
Project Title

Central Berkeley WWTP Flow Diversion - West - Phase 2 Division 3

Physical Address View project details and contacts
City, State (County) SC   (Berkeley County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Includes one triplex submersible pump station complete, MCC electrical building, onsite generator, site piping, wetwell, telemetry antenna pole, fence, landscaping and all associated sitework, as well as approximately 520 linear feet of 36" gravity sewer main, 5 (five) 8'-diameter manholes, and approximately 108 linear feet of 24" force main.
Details
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents