Similar Projects
Jefferson Park Improvements
Renovation
Conception
$2,275,000 est. value
Chicago, IL 60630

Wilson Park Improvements
Renovation
Conception
$3,050,000 est. value
Chicago, IL

Jaycee Park Tennis & Basketball Courts
Infrastructure
Design
Park Ridge, IL

2022 Synthetic Turf
Renovation
Bidding
Cicero, IL 60804

Hoffman and Huntington Park Playground Install
New Construction
Bidding
Hoffman Estates, IL 60192

Pavement Improvements at Various Locations
Post-Bid
Matteson, IL

Pour in Place Playground Surface Repairs and Replacement
Term Contract
Post-Bid
Chicago, IL

I-19-4476 Roadway and Bridge Widening and Reconstruction
Results
$25,000,000 to $50,000,000 est. value
IL

Austin - Laramie State Bank Site - Developer RFP
Results
Chicago, IL 60651

West Garfield Park Outdoor Roller Rink & Community Plaza
New Construction
Pending Verification
$1,500,000 est. value
Chicago, IL 60624

Chicago Pedestrian Plaza
New Construction
Pending Verification
$500,000 est. value
Chicago, IL 60630

Finch Park Playground Replacement Project
Renovation
Bidding
Hoffman Estates, IL 60067

Construction Variable Width Paver Resurfacing
Post-Bid
Harwood Heights, IL

Resurfacing (Smart Overlay), Milled Rumble Strips
Results
Ford Heights, Glenwood, Lansing, Lynwood, IL 60438

West Loop Towers
New Construction - 739,487 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Chicago, IL 60607

Last Updated 03/29/2022 11:49 PM
Project Title

CPS Talcott PS SIT

Physical Address View project details and contacts
City, State (County) Chicago, IL 60622   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work is to remove and replace the existing natural grass with artificial turf field with two lane running track and asphalt pavement. Will consistent of removing existence playground and providing new playground

Details

Park/Playground, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents