Similar Projects
Interior and Exterior Painting Services - Floor Covering Services - Refrigeration Service
Post-Bid
Waco, TX 76700

City Painting Services
Term Contract
Post-Bid
Denton, TX 76209

Repairing & Painting the Interior and Exterior Surfaces of a 55,000 Gallon Elevated Steel Storage Tank
Results
Charlotte, TX

Exterior Paint Project
Results
$100,000 to $250,000 est. value
San Angelo, TX 76908

Rehabilitation and Recoating of One Ground Storage Tank
Post-Bid
TX

2019 Elevated Tank Painting Improvements
Results
$559,000 est. value
Greenville, TX 75402

South Shore Harbor Booster Pump Station Recoating
Post-Bid
Less than $750,000 est. value
League City, TX 77573

Medical Elevated Storage Tank Overcoat Project
Results
Less than $609,000 est. value
San Antonio, TX 78229

Resurfacing, Painting, and Leak Repairs at the Splash
Post-Bid
Sherman, TX 75092

Preston Elevated Tank Painting and Site Improvements
Results
$1,492,000 est. value
Plano, TX

Exterior Painting on 11 Properties
Post-Bid
Bonham, TX 75418

Painting, Drywall and Related Services - Facility Maintenance Contract
Term Contract
Results
Less than $120,000 est. value
Round Rock, TX 78681

BPO for Facility Painting
Post-Bid
Dallas, TX 75226

Z--Balcones Canyonlands Nwr Painting (Multiple Bldgs)
Results
$25,000 to $100,000 est. value
Marble Falls, TX 78654

Interior Painting
Post-Bid
Pittsburg, TX 75686

Last Updated 12/26/2019 02:38 PM
Project Title

Surface Preparation and Application of Belzona 5831 EM Valve Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Fort Worth, TX 76135   (Tarrant County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Coating approximately 400 sq. ft. of pipe with a 2-coat system. The coating required will need to cover 960 sq. ft. (480 x 2 coat system x STD waste factor of 1.20) per pipe. The total square footage for both pipes to be coated is 1,920 sq. ft. The interior will be coated from the back of Valve A all the way to the front of the bonnet before the last spool of pipe. The exterior pipe will be coated from the pipe that runs from interior of Valve C to the first concrete wall.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents